Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
18 768.43 716.9 93.29  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Bouthakurani water supply scheme (Z-II) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000023/2024-2025 630/HSD 12/06/2024 10 PRITAM MUKHOPADHYAY. 1.02 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for 2 nos. pump connection at PH No.-3 & 4 in connection with Augmentation for Bouthakurani water supply scheme (Z-I) , Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000024/2024-2025 631/HSD 12/06/2024 10 PRITAM MUKHOPADHYAY. 1.02 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 3 in connection with Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000250/2023-2024 776/HSD 13/07/2023 10 PRITAM MUKHOPADHYAY. 0.73 0.73 100 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Emergent restoration of approach road for movement of rig machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte Assistant Engineer Junior Engineer ORD/000253/2023-2024 779/HSD 13/07/2023 10 NURJAHAN ENTERPRISE. 0.79 0.79 100 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Additional Emergent restoration of approach road for movement of rig machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000254/2023-2024 780/HSD 13/07/2023 10 SHYAM SUNDAR DAS. 0.55 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte Assistant Engineer ORD/000255/2023-2024 781/HSD 13/07/2023 10 PRITAM MUKHOPADHYAY. 0.60 0.60 100 100
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000256/2023-2024 782/HSD 13/07/2023 10 NURJAHAN ENTERPRISE. 0.93 0.86 92.47 100
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Repairing & construction of boundary wall for movement of rig machineries for sinking of big dia TW at PH no- 4 in connection with Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000258/2023-2024 784/HSD 13/07/2023 10 SHYAM SUNDAR DAS. 0.71 0.35 49.3 100
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Formal work order for for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bouthakurani water supply scheme (Zone-II), Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000520/2022-2023 2402/BD 17/08/2022 90 M/S PROGATI ENTERPRISE. 238.52 236.38 99.1 1
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Formal work order for Laying of UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Bouthakurani water supply scheme (Zone-I), Sandeshkhali-II Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000521/2022-2023 2403/BD 17/08/2022 90 R.K.MANDAL & CO. 239.51 236.33 98.67 1
11 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 48 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-IIblock under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/000719/2023-2024 2472/BD 18/08/2023 30 M/S DATTA ENTERPRISE. 26.97 21.39 79.31 100
12 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Protection works in different places for protection of different dia DI/UPVC rising/distribution pipe line by UC bullah/Bamboo pile for Augmentation of Bouthakurani w/s scheme, Sandeshkhali-II block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer ORD/000849/2023-2024 2657/BD 01/09/2023 30 R.K.MANDAL & CO. 80.57 80.45 99.85 81
13 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bouthakurani w/s scheme (Z-I), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001175/2022-2023 788/BD 13/03/2023 30 M/S DATTA ENTERPRISE. 47.05 38.83 82.53 0
14 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 300 mtr deep Tubewell by D.R. Rig method at PH No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Bouthakurani w/s scheme (Z-II), Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001176/2022-2023 789/BD 13/03/2023 30 M/S DATTA ENTERPRISE. 47.04 37.49 79.7 1
15 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Acceptance cum work order for Route Survey, Design Drawing & DPR Preparation for Augmentation of BOUTHAKURANI Water Supply Scheme under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/002688/2021-2022 230/HSD 02/02/2022 15 UMWELT ENGINEER PVT.LTD. 4.81 4.81 100 1
16 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Material Requisition To Resource Division RTOR000038/2022-2023 2470/BD 24/08/2022 Resource Division 8.30 0.00 0 0
17 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Material Requisition To Resource Division RTOR000085/2022-2023 3365/BD 17/11/2022 Resource Division 3.05 0.00 0 0
18 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme For Bouthakurani to Accommodate FHTC. , SM/11536 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II and III (Zone-I) and Pump House No-I and II (Zone-II)(Rep.) under Bouthakurani W/S Scheme District of 24 Pgs. (N) NIET No.- 32 of EE/EMD of 2022-23 (Sl. No.- 03) Assistant Engineer Junior Engineer ORD/001968/2022-2023 1282/EMD 28/03/2023 30 SINHA ELECTRICALS 66.26 57.89 87.37 0
Total 768.47 716.90 93.29