Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 279.66 143.58 51.34  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC , SM/11523 Augmentation Formal work order for laying of DI/UPVC distribution pipe line and Providing Functional House Hold Tap Connection (FHTC) For Augmentation of Sadiknagar Zone-II Water Supply Scheme in Basirhat-II Block of North 24 Parganas District under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000778/2022-2023 3474/BD 01/12/2022 90 TIRUPATI ENTERPRISES 214.95 120.82 56.21 80
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC , SM/11523 Augmentation Acceptance cum work order for Renovation of Arsenic cum Iron Removal Plant at Sadiknagar zone - II W/S Scheme at Basirhat - II Block under Basirhat Sub Division, PHE Dte. Capacity - 56.25 Cum/hr. Assistant Engineer Junior Engineer ORD/002025/2023-2024 919/BD 15/03/2024 60 MONDAL PRECISION PVT.LTD 29.40 0.00 0 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC , SM/11523 Augmentation Material Requisition To Resource Division RTOR000028/2022-2023 2305/BD 03/08/2022 Resource Division 4.84 0.00 0 0
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC , SM/11523 Augmentation Material Requisition To Resource Division RTOR000166/2022-2023 484/BD 17/02/2023 Resource Division 4.43 0.00 0 0
5 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC , SM/11523 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.II (Zone-II) (Replacement) under Sadiknagar W/S Scheme District of 24 Pgs. (N). (SM/11523) NIET No. 19 of EE/EMD of 2022-23 (Sl. No. - 25) ORD/000596/2022-2023 6439/EMD 25/11/2022 30 MAA KALI ENTERPRISE 12.99 11.38 87.61 0
6 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Sadiknagar (Zone-II) to accommodate FHTC , SM/11523 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I (Zone-II) (Replacement) under Sadiknagar W/S Scheme District of 24 Pgs. (N). (SM/11523) NIET No. 19 of EE/EMD of 2022-23 (Sl. No. - 27) ORD/002033/2022-2023 6438/ EMD 14/08/2022 30 BIDYUT KUMAR MUKHERJEE 13.05 11.38 87.2 1
Total 279.66 143.59 51.34