Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 657.77 387.8 58.96  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Malancha w/s scheme (Zone-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000362/2022-2023 2240/BD 28/07/2022 30 M/S K.P.PAL. 44.40 35.80 80.63 1
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Formal work order for Laying of DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Malancha water supply scheme (Z-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. under barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000541/2022-2023 2449/BD 23/08/2022 90 MONDAL & CO. (BASIRHAT). 297.24 283.96 95.53 1
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile for Augmention of Malancha w/s scheme (Z-II), Minakhan block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/000847/2023-2024 2655/BD 01/09/2023 30 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 50.24 43.92 87.42 37
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Formal work order for Construction of 350 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentation of Malancha water supply scheme (Z-II), Minakhan Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001066/2023-2024 2863/BD 20/09/2023 365 M/S B.K.ENTERPRISE. 152.47 24.12 15.82 75
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Material Requisition To Resource Division RTOR000048/2022-2023 2577/BD 31/08/2022 Resource Division 21.53 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Material Requisition To Resource Division RTOR000086/2022-2023 3363/BD 17/11/2022 Resource Division 3.53 0.00 0 0
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Material Requisition To Resource Division RTOR000262/2022-2023 915/BD 22/03/2023 Resource Division 22.12 0.00 0 0
8 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Malancha Zone-II to accommodate FHTC , SM/10574 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II(Rep.) and III(New) (Zone-I) and Pump House No-I and II (Zone-II)(Rep.) under Malancha W/S Scheme District of 24 Pgs. (N) NIET NO. 32 OF EE/EMD OF 2022-23 (SL. NO. -15) Assistant Engineer Junior Engineer ORD/001675/2022-2023 1013/EMD 09/03/2023 30 MAHADEV ENTERPRISE 66.24 0.00 0 40
Total 657.77 387.80 58.96