Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 696.58 336.53 48.31  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Land development at Over Head Reservoir site for Augmentation of Murarisha water supply scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000176/2024-2025 2457/BD 27/08/2024 15 BARNALI DUTTA 5.44 0.00 0 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Construction of anchor block for resting of 250 mm dia DI pipeline at different places in connection with Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000395/2024-2025 873/HSD 07/08/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.95 0.47 49.47 0
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line, construction of 350 cum capacity 20 mtr staging height R.C.C Over Head Reservoir as per Deptt. design, drawing & specification including bored pile with pile cap and providing Functional Household Tap Connection in connection with Augmentation of Murarisha water supply scheme, Hasnabad Block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000764/2023-2024 2591/BD 28/08/2023 360 S.S.ENTERPRISE. (BAMANGACHI) 576.34 333.77 57.91 98
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Withdrawing & relaying of 110 mm dia. UPVC pipe line from PH no- 1 towards Adibasi Sonali Sangha of Murarisha W/S Scheme,Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/001293/2022-2023 378/HSD 31/03/2023 10 MD.SALIM GAZI. 0.90 0.90 100 0
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Withdrawing & relaying of 110 mm dia. UPVC pipe line from PH no- 1 towards Adibasi Sonali Sangha of Murarisha W/S Scheme,Hasnabad block under Hasnasbad Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/001348/2022-2023 378/HSD 31/03/2023 10 MD.SALIM GAZI. 0.90 0.00 0 0
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Temporary approach road for movement of winch machine and other allied machineries at Head Work site in connection with Augmentation of Murarisha W/S scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/001831/2023-2024 259/HSD 06/03/2024 10 S.S.ENTERPRISE. (BAMANGACHI) 0.94 0.47 50 37
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI pipeline at different places in connection with Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/001837/2023-2024 268/HSD 06/03/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.92 0.45 48.91 100
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Acceptance cum work order for Construction of anchor block for resting of 200 mm dia DI pipeline at different places in connection with Augmentation of Murarisha w/s scheme, Hasnabad block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/001848/2023-2024 274/HSD 06/03/2024 10 NEW MANGES INDUSTRIAL CORPORATION 0.95 0.47 49.47 80
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Material Requisition To Resource Division RTOR000163/2023-2024 4510/BD 28/11/2023 Resource Division 18.10 0.00 0 0
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Material Requisition To Resource Division RTOR000241/2022-2023 934/BD 22/03/2023 Resource Division 27.49 0.00 0 0
11 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Murarisha to accommodate FHTC , SM/10555 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I, II, III and IV(Rep.) under Murarisha W/S Scheme and Jeliakhali-Paschimkhanda (I or II) W/S Scheme in District of 24 Pgs. (N) NIET-32 of EE/EMD of 2022-23 (Sl. no.19) ORD/001160/2023-2024 4810/EMD 09/08/2023 30 SUNRISE ENGINEERING CORPORATION 63.65 0.00 0 0
Total 696.57 336.53 48.31