Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 523.06 357.04 68.26  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Formal work order for construction of 350 cum capacity 20 mtr. staging height R.C.C. Over Head water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Fakirtakia water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000155/2023-2024 1722/BD 08/06/2023 365 SRI KRISHNA CO-OP-LABOUR CONTRACT AND CONST SOC LTD. 153.55 77.92 50.75 72
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near Bitpole in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000249/2023-2024 775/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.94 0.94 100 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Construction of anchor block for resting of 150 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near Chotto Ajgora in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000257/2023-2024 783/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.94 0.94 100 29
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near PH No- 1 in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000263/2023-2024 789/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.98 0.98 100 31
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Construction of anchor block for resting of 100 mm dia DI distribution main pipeline over existing concrete wall beside Basanti Highway at near Baro Ajgora in connection with Augmentation of Fakirtakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000294/2023-2024 778/HSD 13/07/2023 10 NEW LIFE CONSTRUCTION. 0.89 0.89 100 29
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Fakiratakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000358/2022-2023 2236/BD 28/07/2022 30 M/S K.P.PAL. 44.41 15.19 34.2 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Fakirtakia water supply scheme, Sandeshkhali-I Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000596/2022-2023 2674/BD 08/09/2022 90 PROJECT INDIA 228.86 223.88 97.82 1
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Supply, fitting & fixing of sluice valve with valve chember at HW & 2nd TW site in connection with augmentation of Fakitakia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer ORD/001292/2023-2024 1414/HSD 06/11/2023 7 BADAL GHOSH. 0.79 0.40 50.63 100
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for Providing Functional Household Tap Connection (FHTC) for left out house holds under the command area of Fakirtakia water supply scheme in order to provide Har Ghar Jal Certification, Sandeshkhali-I Block under Hasnabad Sub-Division, PHE Dte. Assistant Engineer Junior Engineer ORD/001722/2023-2024 372/BD 06/02/2024 30 SARKAR ENTERPRISE & CO. 47.73 18.36 38.47 75
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Acceptance cum work order for 1 no. pump connection at PH No.-1 in connection with Augmentation for Fakirtakia water supply scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001830/2023-2024 257/HSD 06/03/2024 10 BADAL GHOSH. 0.59 0.29 49.15 0
11 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Material Requisition To Resource Division RTOR000047/2022-2023 2578/BD 31/08/2022 Resource Division 6.15 0.00 0 0
12 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Material Requisition To Resource Division RTOR000173/2022-2023 520/BD 20/02/2023 Resource Division 14.66 0.00 0 0
13 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I under Fakirtakia W/S Scheme District of North 24 Pgs. . NIT No.-12 of EE/EMD of 2022-23 (Sl. No.-01) ORD/000091/2022-2023 5088/EMD 04/11/2022 30 ESENCE ENGINEERING CONCERN 11.28 9.28 82.27 0
14 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Fakirtakia to accommodate FHTC , SM/10392 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.II under Fakirtakia W/S Scheme District of North 24 Pgs. NIET No.- 12 of EE/EMD of 2022-23 (Sl No.-02) ORD/000092/2022-2023 5089/EMD 04/11/2022 30 INDIA ENTERPRISE 11.29 7.97 70.59 0
Total 523.06 357.03 68.26