Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
22 646.93 441.71 68.28  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Sinking of 1 no. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at PH No.- 1 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000016/2023-2024 1202/BD 20/04/2023 30 TRISHA ENTERPRISE & CO. 31.02 23.48 75.69 0
2 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Laying of 200 mm dia. DI distribution main from PH No- 1 to PH No-2 & PH No- 2 to N/H/O Sudip Gayen for damage portion within Korakati w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000264/2022-2023 1186/HSD 13/07/2022 15 R.K.MANDAL & CO. 4.25 4.25 100 1
3 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Laying of 150 mm dia. DI distribution main from near PH No-1 to N/H/O Prasanta Mondal, N/H/O Sudip Gayen to Chanchal Chatterjee & Sudip Gayen to Santanu Joardar for damage portion within Korakati w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000267/2022-2023 1189/HSD 13/07/2022 15 R.K.MANDAL & CO. 4.27 4.27 100 1
4 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Laying of 100mm dia. DI distribution main from N/H/O Chanchal Chatterjee to N/H/O Kritanta Mondal & Biswajit Baidya for damage portion within Korakati w/s scheme, Sandeshkhali-II Block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000269/2022-2023 1191/HSD 13/07/2022 10 R.K.MANDAL & CO. 2.17 2.17 100 1
5 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Restoration of RCC drain from Joygram Bazar Idgah to near Pintu Molla Garage for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000317/2022-2023 1238/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 0.00 0 1
6 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Restoration of RCC drain from Pintu Molla Garage to N/H/O Sahidul Molla for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000319/2022-2023 1240/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 0.00 0 1
7 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Restoration of RCC drain from Near Julfikar Molla shop to N/H/O Sariful Molla for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000323/2022-2023 1244/HSD 20/07/2022 21 JESMINE ENTERPRISE. 3.39 0.00 0 1
8 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Restoration of RCC drain from N/H/O Sahidul Molla to near Julfikar Molla shop for damaged portion due to laying of 150 mm dia DI Rising main of Kumarjole w/s scheme, Minakhan block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000325/2022-2023 1246/HSD 20/07/2022 21 JESMINE ENTERPRISE. 4.76 0.00 0 1
9 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter for Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000361/2022-2023 2239/BD 28/07/2022 30 SHIBU BISWAS. 54.44 0.00 0 0
10 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Formal work order for Laying of DI rising main, DI/UPVC distribution pipe line and providing Functional Household Tap Connection for Augmentation of Korakati water supply scheme, Sandeshkhali-II Block within Hasnabad Sub-Division, under Barasat Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000602/2022-2023 2675/BD 08/09/2022 90 PATHIK PABAN NANDI 274.10 265.59 96.9 1
11 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Protection works in different places for protection of different dia. DI/UPVC rising/distribution pipeline by UC bullah/Bamboo pile for Augmention of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/000844/2023-2024 2680/BD 04/09/2023 30 ANKIT CONSTRUCTION 66.88 66.57 99.54 82
12 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 2 in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000854/2023-2024 1041/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.90 100 100
13 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000855/2023-2024 1042/HSD 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.90 100 100
14 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for Dismantling & Re-construction of boundary wall for movement of rig & other allied machineries for sinking of big dia TW at PH no- 1 in connection with Augmentation of Korakati w/s scheme, Sandeshkhali-II block under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer ORD/000856/2023-2024 1042-HSD. 31/08/2023 10 ANKUSH CONSTRUCTION & CO. 0.90 0.00 0 0
15 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Formal work order for construction of 250 cum capacity 20 mtr. staging height R.C.C. Over Head Water Reservoir as per Departmental design, drawing and specification including bored pile & pile cap for Augmentaion of Korakati water supply scheme, Sandeshkhali-II Block of Hasnabad Sub-Division, under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001253/2023-2024 4190/BD 30/10/2023 365 M/S K.B.ENTERPRISE. 140.14 53.20 37.96 85
16 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Acceptance cum work order for 2 nos. pump connection at PH No.-1 & 2 in connection with Augmentation for Korakati water supply scheme, Sandeshkhali-II block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer ORD/001290/2023-2024 1412/HSD 06/11/2023 7 ANKUSH CONSTRUCTION & CO. 0.91 0.46 50.55 59
17 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Material Requisition To Resource Division RTOR000046/2022-2023 2576/BD 31/08/2022 Resource Division 6.15 0.00 0 0
18 NORTH 24 PARAGANAS Barasat Division Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Material Requisition To Resource Division RTOR000257/2022-2023 918/BD 22/03/2023 Resource Division 10.90 0.00 0 0
19 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator at (inconnection with Aug. work related to FHTC) Pump House No.II (Replacement) under Korakati W/S Scheme District of North 24 Pgs. ORD/000024/2022-2023 3035/ EMD 08/08/2022 30 SANKAR PRASAD DUTTA & CO, 10.14 0.00 0 1
20 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator at (inconnection with Aug. work related to FHTC) Pump House No.II (Replacement) under Korakati W/S Scheme District of North 24 Pgs. ORD/001931/2022-2023 3035/EMD 08/08/2022 210 SANKAR PROSAD DUTTA & CO. 9.33 9.33 100 0
21 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I (replacement) under Korakati W/S Scheme District of North 24 Pgs. Tender No.- 08 (Sl. No.-03) of EE/EMD of 2022-23 ORD/002708/2022-2023 3384EMD 09/09/2022 30 CHATTERJEE BROTHERS 11.31 10.31 91.16 70
22 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of Ground water based piped water supply scheme for Korakati, Block Sandeshkhali-II. , SM/10376 Augmentation Supply delivery & fixing at site 4 Core, 50 Sq. Mm XLPE Al, Ar. Cable for shifting of service connection cable at Head Work site of Korakati W/S Scheme District of 24Pgs(N). Assistant Engineer Junior Engineer ORD/003180/2023-2024 295/EMSD-I 11/03/2024 10 TAKE ME INDIA 0.55 0.28 50.91 100
Total 646.94 441.70 68.27