Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 669.24 337.14 50.38  
1 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Formal work order for Providing Functional House Hold Tap Connection (FHTC) from existing and new proposed distribution system within command area at Krishnachandrapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte.(Augmentation) Assistant Engineer Junior Engineer ORD/000008/2022-2023 1174/BD 19/04/2022 90 SUPRITI ENTERPRISE. 392.59 260.82 66.44 1
2 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Construction of Approach Road Head Work at site for Augmentation of Krishnacandrapur Water Supply Scheme within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000640/2023-2024 623/Bon 08/08/2023 25 ROY CHOWDHURY CONSTRUCTION. 4.73 2.36 49.89 100
3 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Acceptance cum work order for Repair and renovation works of R.C.C. Elevated Reservoir of 456 cum for Krishnachandrapur Water Supply Scheme under Bongaon Sub-Division, PHE Dte. Assistant Engineer ORD/001013/2022-2023 189/BD 20/01/2023 30 TRISHA ENTERPRISE & CO. 19.03 18.97 99.68 100
4 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Acceptance cum work order for Sinking of 2 (two) no. 300 mm. x 200 mm. dia. 250 mtr deep Replacement Tubewell by D.R. Rig method with UPVC pipe & UPVC ribbed strainer for Augmentation of Krishnachandrapur Water Supply Scheme (H/W Site & 2nd T/W Site) under Bongaon Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001154/2023-2024 2945/BD 27/09/2023 60 JOY GURU ENTERPRISE 32.24 14.00 43.42 100
5 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Acceptance cum work order for Renovation and repairing of Boundary wall at Head Work site for Augmentation of Krishnachandrapur Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001739/2023-2024 535/BD 21/02/2024 45 ANKUSH CONSTRUCTION & CO. 17.78 0.00 0 100
6 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Formal Work order for Providing Functional Household Tap Connection (FHTC) to the uncovered household and laying of UPVC Dedicated Main Pipe Line towards different mouza for better supply of drinking water along with pipe protection and Road Restoration work under Augmentation work at Krishnachandrapur W/S Scheme at Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/002022/2023-2024 887/BD 14/03/2024 90 SAHA CONSTRUCTION & CO 108.90 39.85 36.59 75
7 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Repairing & Renovation of 01No. Pump House and allied works at Krishnachandrapur water supply scheme under Bongaon Sub-Division, P.H.E.Dte. Assistant Engineer Junior Engineer ORD/002952/2021-2022 636/BON 31/12/2021 21 ACHINTA KUMAR HALDER. 1.26 1.14 90.48 1
8 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Material Requisition To Resource Division RTOR000007/2022-2023 1362/BD 13/05/2022 Resource Division 20.47 0.00 0 0
9 NORTH 24 PARAGANAS Barasat Division Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Material Requisition To Resource Division RTOR000016/2022-2023 1674/BD 13/06/2022 Resource Division 20.09 0.00 0 0
10 NORTH 24 PARAGANAS Eastern Mechanical Augmentation of ground water based piped water supply scheme for Krishnachandrapur to accommodate FHTC, Block - Bongaon , SM/10308 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (Rep) under Krishnachandrapur W/S Scheme and Chowberia W/S Scheme District of 24 Pgs. (N) Assistant Engineer Junior Engineer ORD/001173/2023-2024 4801/EMD 09/08/2023 30 A.G ENTERPRISE. 52.15 0.00 0 50
Total 669.23 337.15 50.38