Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
17 997.2 169.33 16.98  
1 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Additional land development for connecting road at tube well site-1 (H/W site) within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000113/2022-2023 930/HSD 07/06/2022 21 M/S DATTA ENTERPRISE. 2.01 2.01 100 1
2 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Additional land development at tube well site-1 (H/W site) within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000114/2022-2023 931/HSD 07/06/2022 21 M/S PROGATI ENTERPRISE. 4.53 4.53 100 1
3 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Construction of switch room cum chlorine room with sanitary and water supply arrangement including plinth protection at PH No.-1 (Size-5.40x3.60 mtr.) & PH No.-2 (Size-3.60x3.00 mtr.) within Nityabaria w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000209/2022-2023 1889/BD 05/07/2022 60 BABUSONA CONSTRUCTION. 12.50 12.63 101.04 10
4 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance Cum Work order for Sinking of 2 nos. 300 mm. x 200 mm. dia. 360 mtr deep Tubewell by D.R. Rig method at Pump House No.- 1 & 2 with PVC pipe & strainer having 300mm dia 36 mtr. long housing pipe & 200mm dia 30 mtr. long filter within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000369/2022-2023 2245/BD 28/07/2022 30 M/S K.P.PAL. 54.44 36.84 67.67 0
5 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Geotechnical investigation for the construction of proposed OHR (Capacity 400 M3 ) at HW site within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000550/2022-2023 1380/HSD 04/08/2022 30 RANJIT MITRA SUPPLIERS 0.73 0.73 100 0
6 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Formal work order for "Laying of DI rising main, DI/UPVC distribution pipe line, Providing Functional Household Tap Connection & Construction of 400 cum capacity 20 mtr staging height R.C.C Over Head water Reservoir as per Department design, drawing & specification including bored pile & pile cap in connection with Nityaberia water supply scheme, Sandeshkhali-I Block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000721/2023-2024 2577/BD 25/08/2023 360 KINGS & CO. 859.85 86.85 10.1 0
7 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Protection work for protection of 2nd pump house at canal side by UC bullah pilling within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte Assistant Engineer ORD/000860/2023-2024 1046/HSD 31/08/2023 10 BABUSONA CONSTRUCTION. 0.95 0.95 100 100
8 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Land development at tube well site-1 within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001025/2021-2022 13/HSD 04/01/2022 15 M/S DATTA ENTERPRISE. 4.93 4.87 98.78 1
9 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Land development at tube well site-2 within Nityabaria w/s scheme, Sandeshkhali-I under Hasnabad Sub-Division P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001027/2021-2022 15/HSD 04/01/2022 10 M/S PROGATI ENTERPRISE. 1.59 1.59 100 1
10 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Sinking of 1 No. 360.00 mtr. Deep 100 X 40 mm. dia. trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-1 for Nityabaria w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001039/2021-2022 25/HSD 04/01/2022 15 GOBINDA DAS. 3.14 2.70 85.99 1
11 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Sinking of 1 No. 360.00 mtr. Deep 100 X 40 mm. dia. trial-cum-production Tube well fitted with Indian Mark - II pump with PVC pipe & strainers at T/W site-2 for Nityabaria w/s scheme, Sandeshkhali-I block under Hasnabad Sub-Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/001041/2021-2022 27/HSD 04/01/2022 15 M/S GHOSH CONSTRUCTION. 3.14 2.58 82.17 1
12 NORTH 24 PARAGANAS Sandeshkhali - I Barasat Division NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Acceptance cum work order for Additional height for construction of PH No- 2 & other allied works at located canal side within Nityaberia w/s scheme, Sandeshkhali-I block under Hasnabad Sub- Division P.H.E. Dte. Assistant Engineer ORD/001289/2023-2024 1411/HSD 06/11/2023 10 BABUSONA CONSTRUCTION. 0.97 0.96 98.97 100
13 NORTH 24 PARAGANAS Sandeshkhali - I Eastern Mechanical NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New New Service Connection under AE-I Nityaberia BILL/01864/2023-2024 BP-98-23-24 31/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 1.91 0.00 0 0
14 NORTH 24 PARAGANAS Sandeshkhali - I Eastern Mechanical NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Deposit works, Other Than new Service Connection under AE-I Nityaberia BILL/01865/2023-2024 BP-97-23-24 31/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 8.95 0.00 0 0
15 NORTH 24 PARAGANAS Sandeshkhali - I Eastern Mechanical NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New New Service Connection under AE-I Nityaberia BILL/01866/2023-2024 BP-100-23-24 31/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 0.85 0.00 0 0
16 NORTH 24 PARAGANAS Sandeshkhali - I Eastern Mechanical NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Deposit Works, other than new service connection (GL:4704001) under AE-I Nityaberia BILL/01867/2023-2024 BP-99-23-24 31/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 9.94 0.00 0 0
17 NORTH 24 PARAGANAS Sandeshkhali - I Eastern Mechanical NITYABARIA PIPED WATER SUPPLY SCHEME , SM/10182 New Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer and Automatic Chlorinator (in connection with Aug. work related to FHTC) at Pump House No.I and II (New) under Nityaberia W/S Scheme District of 24 Pgs. (N) NIET No.- 27 of EE/EMD of 2022-23 (Sl. No.- 29) Assistant Engineer Junior Engineer ORD/000001/2023-2024 1438/EMD 10/04/2023 30 M/S DAS ENTERPRISE 26.77 12.09 45.16 90
Total 997.20 169.32 16.98