Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 869.85 59.19 6.8  
1 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New KHANDRA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Monteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte J.E. 1 BURDWAN ORD/000691/2023-2024 4387/BWD 05/10/2023 365 AZAD ENTERPRISE 631.12 59.19 9.38 40
2 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000580/2023-2024 4894/BWD 10/11/2023 Resource Division 36.98 0.00 0 0
3 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000769/2023-2024 205/BWD 10/01/2024 Resource Division 19.71 0.00 0 0
4 PURBA BARDHAMAN Manteswar Burdwan Division KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Material Requisition To Resource Division RTOR000779/2023-2024 322/BWD 24/01/2024 Resource Division 42.03 0.00 0 0
5 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New service connection for Khandra PH-3 PWSS. BILL/00087/2024-2025 BP-2024-25-26 19/04/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.24 0.00 0 0
6 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New Service connection at KHANDRA PWSS TW-1. BILL/02366/2023-2024 BP-2023-24-486 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.37 0.00 0 0
7 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New New Service connection at KHANDRA PWSS TW-2. BILL/02367/2023-2024 BP-2023-24-487 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.60 0.00 0 0
8 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 90 SINHA ELECTRICALS 78.06 0.00 0 0
9 PURBA BARDHAMAN Manteswar Central Mechanical KHANDRA PIPED WATER SUPPLY SCHEME , SM/18505 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KHANDRA Water Supply Scheme [ Block-MONTESWAR] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/000920/2023-2024 4184/CMD 29/08/2023 30 P.K. ENGINEERING 44.74 0.00 0 0
Total 869.85 59.19 6.8