Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 1,251.82 0 0  
1 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to SIMULIA & LAKSHIMPUR Piped Water Supply Scheme under Mongalkote Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000694/2023-2024 4363/BWD 04/10/2023 365 PUSPA ENTERPRISE 1,090.95 0.00 0 37
2 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000323/2023-2024 2197/BWD 12/05/2023 Resource Division 18.62 0.00 0 0
3 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000528/2023-2024 4303/BWD 29/09/2023 Resource Division 4.13 0.00 0 0
4 PURBA BARDHAMAN Mangolkote Burdwan Division SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Material Requisition To Resource Division RTOR000809/2023-2024 307/BWD 24/01/2024 Resource Division 32.21 0.00 0 0
5 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New New service connection charges for Simulia PWSS TW-2 BILL/02196/2023-2024 BP-2023-24-377 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.22 0.00 0 0
6 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New New service connection charges for Shimulia PWSS TW-1 BILL/02197/2023-2024 BP-2023-24-376 16/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.42 0.00 0 0
7 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Lakshimpur & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000097/2024-2025 2406/CMD 02/08/2024 90 CHOUDHURY ENTERPRISE 57.65 0.00 0 0
8 PURBA BARDHAMAN Mangolkote Central Mechanical SIMULIA PIPE WATER SUPPLY SCHEME , SM/18459 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at SIMULIA Water Supply Scheme [ Block- MONGOLKOTE ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000796/2023-2024 4084/CMD 29/08/2023 30 P.K. ENGINEERING 41.62 0.00 0 0
Total 1,251.82 0.00 0