Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 1,769.62 120.74 6.82  
1 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Continuation Work Order for Supply of 1 (one) No. Inspection Vehicle for different JJM Related Works as and when required including supply of driver and fuels (Minimum 8 Hours of duty) under Katwa Sub-Division within Burdwan Division, P.H.E. Dte. Consider 96.00 Km run per Day Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000107/2024-2025 485/KTS 16/04/2024 72 AJIT SAMANTA 0.92 0.00 0 10
2 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 365 ASHOK KUMAR GHOSH 1,588.10 111.18 7 15
3 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000389/2023-2024 2197/BWD 12/05/2023 Resource Division 1.75 0.00 0 0
4 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000406/2023-2024 3826/BWD 01/09/2023 Resource Division 4.47 0.00 0 0
5 PURBA BARDHAMAN Mangolkote Burdwan Division KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Material Requisition To Resource Division RTOR000801/2023-2024 308/BWD 24/01/2024 Resource Division 32.08 0.00 0 0
6 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New QUOTATION FOR NEW SERVICE CONNECTION AT KULSANA PWSS TW-1 BILL/00367/2024-2025 BP-2024-25-187 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.91 0.00 0 0
7 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Quotation for new service connection at Kulsana PWSS TW-2 BILL/00376/2024-2025 BP-2024-25-186 08/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.43 0.00 0 0
8 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
9 PURBA BARDHAMAN Mangolkote Central Mechanical KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at KULSANA Water Supply Scheme [ Block-MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000876/2023-2024 4139/CMD 29/08/2023 30 M/S, S.S. ENTERPRISE. 44.56 0.00 0 0
10 PURBA BARDHAMAN Mangolkote Central Drilling KULSANA PIPE WATER SUPPLY SCHEME , SM/18440 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Kulsana W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000154/2023-2024 1341/CDD 13/09/2023 30 SUNRISE ENGINEERING CORPORATION 23.34 9.56 40.96 0
Total 1,769.63 120.73 6.82