Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,232.6 102.57 8.32  
1 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BARABAINAN & CHAUDANGA Piped Water Supply Scheme under Raina ¿ II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000412/2023-2024 3257/BWD 27/07/2023 365 SK ALIM 1,144.16 90.71 7.93 30
2 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Continuation Work Order supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-11-2023 to 31-01-2024) ORD/000985/2023-2024 2561/BSD 30/10/2023 66 MD HASIN 0.85 0.00 0 0
3 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-02-2024 to 30-04-2024) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/001181/2023-2024 188/BSD 31/01/2024 66 PARVIN BEGAM 0.85 0.28 32.94 97
4 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000231/2023-2024 2155/BWD 10/05/2023 Resource Division 10.15 0.00 0 0
5 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000232/2023-2024 2197/BWD 12/05/2023 Resource Division 10.15 0.00 0 0
6 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000424/2023-2024 3838/BWD 01/09/2023 Resource Division 8.01 0.00 0 0
7 PURBA BARDHAMAN Raina - II Burdwan Division Bara Bainan Piped Water Supply Scheme , SM/18406 New Material Requisition To Resource Division RTOR000788/2023-2024 320/BWD 24/01/2024 Resource Division 21.17 0.00 0 0
8 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Quotation for new electric service connection at Bara Bainan PH NO.-1 BILL/01742/2023-2024 BP-2023-24-262 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.49 0.00 0 0
9 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New New service connection charges for Bara Bainan PWSS TW-2 BILL/02212/2023-2024 BP-2023-24-387 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.11 0.00 0 0
10 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New New Service connection at BARA BAINAN PWSS TW-1. BILL/02361/2023-2024 BP-2023-24-485 31/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.68 0.00 0 0
11 PURBA BARDHAMAN Raina - II Central Mechanical Bara Bainan Piped Water Supply Scheme , SM/18406 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Barabainan Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000725/2023-2024 4036/CMD 29/08/2023 30 S.K. ENTERPRISE 28.98 11.58 39.96 96
Total 1,232.59 102.57 8.32