Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 966.67 245.28 25.37  
1 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-B]. AE(HQs) ORD/000302/2024-2025 2825/BWD 19/07/2024 20 KEJRIWAL CASTINGS LIMITED 4.82 0.00 0 0
2 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-C]. AE(HQs) ORD/000306/2024-2025 2829/BWD 19/07/2024 20 JINDAL SAW LTD. 4.63 0.00 0 0
3 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply of various D.I. Mechanical joints & specials for KATNABIL & BANTIR Piped W/S. Scheme within Burdwan Sub-Division under Burdwan Division, PHE. Dte. [Part-A]. AE(HQs) ORD/000313/2024-2025 2837/BWD 19/07/2024 20 ELECTROSTEEL CASTING LIMITED 4.95 0.00 0 0
4 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New BANTIR Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000410/2023-2024 3255/BWD 27/07/2023 365 SK ALIM 797.64 233.87 29.32 70
5 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related (schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-08-2024 to 31-10-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000557/2024-2025 1500/BSD 30/07/2024 66 PARVIN BEGAM 0.85 0.00 0 0
6 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000230/2023-2024 2155/BWD 10/05/2023 Resource Division 16.06 0.00 0 0
7 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000420/2023-2024 3862/BWD 01/09/2023 Resource Division 3.19 0.00 0 0
8 PURBA BARDHAMAN Raina - I Burdwan Division BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Material Requisition To Resource Division RTOR000652/2023-2024 5098/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
9 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New New electric connection for Bantir PWSS, PH-1. BILL/01873/2023-2024 BP-2023-24-359 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.18 0.00 0 0
10 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New New service connection charges for Bantir PWSS TW-2 BILL/02198/2023-2024 BP-2023-24-402 17/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.33 0.00 0 0
11 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
12 PURBA BARDHAMAN Raina - I Central Mechanical BANTIR PIPED WATER SUPPLY SCHEME , SM/18300 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bantir Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000718/2023-2024 4029/CMD 29/08/2023 30 M.S. ENTERPRISE 28.98 11.41 39.37 96
Total 966.68 245.27 25.37