1 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-05-2025 to 30-06-2025) |
ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE |
Contractual Junior Engineer |
ORD/000045/2025-2026 |
113/RWS |
30/04/2025 |
61 |
MD HASIN |
0.80 |
0.00 |
0 |
0 |
2 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Upgradation of Boundary wall, Drain & land development at Head work site for SHAKTIGAR PWSS under Burdwan-Sub Div, Block-Burdwan II under Burdwan Div. PHE Dte. |
Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. |
|
ORD/000051/2025-2026 |
1425/BWD |
20/05/2025 |
30 |
SARKAR AGENCY |
5.39 |
0.00 |
0 |
0 |
3 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Crossing of Old G.T Road near Head Works with 250 mm dia pipeline through pushing of 750mm.dia RCC casing pipe by hydraulic jacking method for Saktigarh W/S Scheme (Augmentation) under Burdwan Division, PHE Dte. |
|
Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt |
ORD/000083/2024-2025 |
153/RWS |
29/04/2024 |
25 |
IJABUL SEKH |
6.55 |
0.00 |
0 |
100 |
4 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-07-2024 to 31-08-2024). |
|
Contractual Junior Engineer |
ORD/000364/2024-2025 |
207/RWS |
28/06/2024 |
61 |
MD HASIN |
0.80 |
0.00 |
0 |
0 |
5 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Continuation for the work of Supply of one No. Diesel Driven Car ( other than Ambasader) on hire basis for the office
of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-09-2024 to 31-10-2024). |
|
Contractual Junior Engineer |
ORD/000561/2024-2025 |
274/RWS |
30/08/2024 |
61 |
MD HASIN |
0.80 |
0.00 |
0 |
0 |
6 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office
of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-11-2024 to 31-12-2024). |
ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE |
Contractual Junior Engineer |
ORD/000763/2024-2025 |
352/RWS |
30/10/2024 |
61 |
MD HASIN |
0.80 |
0.00 |
0 |
0 |
7 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Augmentation of SAKTIGARH Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC & Construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under BARDHAMAN-II Block, District:- Purba-Bardhaman. |
ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE |
Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt |
ORD/000896/2023-2024 |
5376/BWD |
07/12/2023 |
180 |
IJABUL SEKH |
203.46 |
0.00 |
0 |
50 |
8 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Continuation for the work of Supply of one No. Diesel Driven Car (other than Ambasader) on hire basis for the office
of the Assistant Engineer, RWS Burdwan Sub-Division, PHE Dte. (Period from 01-01-2025 to 28-02-2025). |
ASSISTANT ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE |
Contractual Junior Engineer |
ORD/000995/2024-2025 |
413/RWS |
31/12/2024 |
59 |
MD HASIN |
0.79 |
0.00 |
0 |
0 |
9 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Protection of LDS of Saktigarh PWSS Augmentation at the node point of 36-44-64 under Burdwan Division, PHE Dte. [SM-16479] |
|
Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt |
ORD/001168/2023-2024 |
92/RWS |
13/03/2024 |
20 |
KHUSI BHAKAT |
0.78 |
0.00 |
0 |
100 |
10 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Protection of LDS of Saktigarh PWSS Augmentation at the node point of 75-123 under Burdwan Division, PHE Dte. [SM-16479] |
|
Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt |
ORD/001169/2023-2024 |
93/RWS |
13/03/2024 |
20 |
GHOSH ENTERPRISE |
0.79 |
0.00 |
0 |
100 |
11 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Protection work of LDS and approach road to 2nd Pump-House of Saktigarh PWSS Augmentation at the node point of 161-166 under Burdwan Division, PHE Dte. [SM-16479] |
|
Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt |
ORD/001170/2023-2024 |
94/RWS |
13/03/2024 |
20 |
JAYANTA CHAKRABORTY |
0.95 |
0.00 |
0 |
100 |
12 |
PURBA BARDHAMAN |
|
Burdwan Division |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Continuation Work for the supply of one no. Diesel driven Motor Cab/Maxi Cab (Air Conditioner) on hire basis for the
office of the Assistant Engineer, to be used by the Assistant Engineer, RWS Burdwan Sub-Divn., PHE. Dte. (Period
from 01/01/2024 to 29/02/2024) |
|
Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt |
ORD/001221/2023-2024 |
403/RWS |
29/12/2023 |
62 |
MD HASIN |
0.80 |
0.00 |
0 |
0 |
13 |
PURBA BARDHAMAN |
|
Central Mechanical |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Quotation for new service connection for Shaktigarh PWSS PH-2 |
|
|
BILL/00294/2024-2025 |
BP-2024-25-183 |
08/07/2024 |
0 |
WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) |
3.48 |
0.00 |
0 |
0 |
14 |
PURBA BARDHAMAN |
|
Central Mechanical |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Quotation for new service connection at Augmentation of Shaktigarh W/S Scheme TW-3. |
|
|
BILL/00372/2024-2025 |
BP-2024-25-184 |
08/07/2024 |
0 |
WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) |
4.01 |
0.00 |
0 |
0 |
15 |
PURBA BARDHAMAN |
|
Central Mechanical |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Additional quotation for conversion of HTOH line from HT at Saktigarh (Aug) PWSS. |
|
|
BILL/00442/2024-2025 |
BP-2024-25-231 |
30/07/2024 |
0 |
WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) |
9.08 |
0.00 |
0 |
0 |
16 |
PURBA BARDHAMAN |
|
Central Mechanical |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Saktigrah Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. |
ASSISTANT ENGINEER |
Junior Engineer |
ORD/000098/2023-2024 |
2587/CMD |
07/06/2023 |
755 |
P.K. ENGINEERING |
22.69 |
0.00 |
0 |
95 |
17 |
PURBA BARDHAMAN |
|
Central Mechanical |
AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR SHAKTIGARH , SM/16479 |
Augmentation |
Illumination arrangement & different electro-mechanical works at SAKTIGARH water supply scheme under Bardhaman-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman |
ASSISTANT ENGINEER |
Junior Engineer |
ORD/000479/2024-2025 |
2956/CMD |
20/11/2024 |
60 |
CHOUDHURY ENTERPRISE |
14.34 |
0.00 |
0 |
0 |