Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 1,693.88 18.19 1.07  
1 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Balance work for OHR, extension of pipeline to provide FHTC with sinking of tube well, construction of pump house, boundary wall, land development, plinth protection for pump house, approach road & other related work under Murgram, Moregram, Malgram, Khanji, PWSS under Katwa Sub Division, Block- Ketugram-I, Burdwan Division PHE Dte. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000289/2024-2025 2739/BWD 12/07/2024 120 PUSPA ENTERPRISE 185.75 0.00 0 0
2 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to MALGRAM, MURGRAM, MORGRAM & KHANJI Piped Water Supply Scheme under KETUGRAM -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000435/2023-2024 3387/BWD 03/08/2023 365 PUSPA ENTERPRISE 1,333.98 0.00 0 40
3 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000099/2023-2024 1962/BWD 25/04/2023 Resource Division 5.23 0.00 0 0
4 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000379/2023-2024 2197/BWD 12/05/2023 Resource Division 12.94 0.00 0 0
5 PURBA BARDHAMAN Ketugram - I Burdwan Division KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Material Requisition To Resource Division RTOR000748/2023-2024 5261/BWD 30/11/2023 Resource Division 20.18 0.00 0 0
6 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New New service connection charges for Khanji PWSS TW-2 BILL/01665/2023-2024 BP-2023-24-223 10/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.96 0.00 0 0
7 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Quotation for new electric service connection at Khanji PWSS TW No-1 BILL/01731/2023-2024 BP-2023-24-270 11/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.48 0.00 0 0
8 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Rajur & others water supply scheme under Ketugram-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000098/2024-2025 2407/CMD 02/08/2024 90 M.S. ENTERPRISE 82.29 0.00 0 0
9 PURBA BARDHAMAN Ketugram - I Central Mechanical KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at KHANJI Water Supply Scheme [ Block- KETUGRAM-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000842/2023-2024 4114/CMD 29/08/2023 30 M/S. S.R. ENTERPRISE 29.41 11.56 39.31 97
10 PURBA BARDHAMAN Ketugram - I Central Drilling KHANJI PIPED WATER SUPPLY SCHEME , SM/16476 New Providing drilling crew and other allied works or construction of Tube Well (250mm x 200mm x 114 Mtrs. Depth) by utilising Departmental machineries for Khanji Scheme (T/W-i & II) ketugram-I Block under Purba Bardhaman District, CDD PHE Dte. Driller In Charge Junior Engineer ORD/000055/2023-2024 861/CDD 10/07/2023 30 OSMAN SEKH 16.66 6.63 39.8 100
Total 1,693.87 18.19 1.07