Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 368.24 43.27 11.75  
1 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Augmentation of SONARUDRA PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jivan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000152/2023-2024 2442/BWD 30/05/2023 60 ROHAN MONDAL 43.32 30.83 71.17 20
2 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Different Types of work involved in connection with Augmentation of SONARUDRA (SM/16349) & KACHUA (SM/13497) Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000192/2024-2025 2430/BWD 27/06/2024 120 R.G. INFRASTRUCTURE 240.70 0.00 0 2
3 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 0.00 0 45
4 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Laying of 140 mm dia HDPE Pipeline from Sonarudra Head Work Site more to upto Shyambati & Baidyapur more (Sec 34-2-3-6-10-12-14-16-16A-16B) of SONARUDRA W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000601/2021-2022 1486/BWD 14/03/2022 30 HAMID SK 18.85 5.23 27.75 100
5 PURBA BARDHAMAN Burdwan Division RETROFITTING OF SONARUDRA PIPED WATER SUPPLY SCHEME , SM/16349 Retrofitting Sinking of additional Tube Well, construction of pump house & boundary wall & laying interconnection of SONARUDRA Piped water supply scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (PP Site- Shyambati Baidyapur). Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000864/2023-2024 5295/BWD 01/12/2023 60 HI-LIGHT ELECTRONICS 27.37 7.21 26.34 60
Total 368.24 43.27 11.75