Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 651.69 20.8 3.19  
1 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Augmentation of NADANGHAT PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - I Block, Purba Burdwan District under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000077/2023-2024 2043/BWD 03/05/2023 60 HAFIJUR RAHAMAN MIDYA 26.28 20.80 79.15 100
2 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Laying of Rising Main and distribution system with FHTC work, sinking of tube wells with other allied works in connection with Augmentation of NADANGHAT Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000130/2024-2025 2066/BWD 07/06/2024 120 TIRUPATI ENTERPRISES 272.43 0.00 0 0
3 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Conducting physical Household Survey at the IMIS reported village for HGJ certification and providing balance FHTC for Har Ghar Jal certification including conducting Gram Sabhas for different IMIS reported villages across the district under Burdwan Division, PHE Dte. AE(HQs),Assistant Engineer ,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000428/2024-2025 3107/BWD 12/08/2024 90 TUBGRAM GRAMMYAK UNNAYAN SAMITY 309.60 0.00 0 50
4 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Work Order for "Restoration and laying of HDPE Pipeline at 2nd Pump House adjacent to Parulia village of PARULIA PWSS & Nadanghat PWSS (SM/16298) under Kalna Sub-Division under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000553/2024-2025 773/KSD 12/07/2024 15 HAMID SK 0.96 0.00 0 100
5 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Work Order for "Restoration and laying of HDPE Pipeline at 2nd Pump House adjacent to Dogachhia village of DOGACHHIA PWSS & Nadanghat PWSS (SM/16298) under Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000554/2024-2025 774/KSD 12/07/2024 15 HAMID SK 0.96 0.00 0 100
6 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Quotation for load enhancement at Nadanghat PWSS PH 2. BILL/00225/2024-2025 BP-2024-25-116 28/05/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.89 0.00 0 0
7 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Illumination arrangement at Nadanghat water supply scheme under Purbasthali-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000403/2024-2025 2782/CMD 01/10/2024 60 SUBRATA BHADRA 16.18 0.00 0 0
8 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF NADANGHAT PIPED WATER SUPPLY SCHEME , SM/16298 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of NADANGHAT[PURBASTHALI-I] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001082/2023-2024 4440/CMD 04/10/2023 30 S.K. ENTERPRISE 24.39 0.00 0 0
Total 651.68 20.80 3.19