Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 642.27 7.26 1.13  
1 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Different types of works involve in connection with Augmentation of JHAUDANGA (SM/16293), KASHIPUR (SM/16297), PATULI (SM/09718) & PARULIA (SM/09719) Piped water supply scheme under Purbasthali-II Block, Kalna Sub-Division, PHE Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000163/2024-2025 2202/BWD 13/06/2024 120 MONDAL PRECISION PVT LTD 570.00 0.00 0 2
2 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Augmentation of KASHIPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising Main, under Jal Jeevan Mission of Purbasthali - II Block, Purba Burdwan District under Burdwan Division, PHE.Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000176/2023-2024 2588/BWD 01/06/2023 60 BAKSHI ENTERPRISE 19.74 6.93 35.11 100
3 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 0.00 0 10
4 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Work Order for "CONSTRUCTION OF TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL FOR KASHIPUR PWSS UNDER KALNA SUB-DIVISION UNDER BURDWAN DIVISION, PHE DTE." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/001166/2023-2024 2022/KSD 06/03/2024 10 DEL DELTA CONSTRUCTION 0.66 0.33 50 100
5 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation New service connection charges for Kashipur PWSS TW-1 BILL/01866/2023-2024 BP-2023-24-356 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.77 0.00 0 0
6 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIPUR PIPED WATER SUPPLY SCHEME , SM/16297 Augmentation Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Augmentation of KASHIPUR[PURBASTHALI-II] Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ORD/001080/2023-2024 4437/CMD 01/11/2023 30 DUTTA ENTERPRISE 24.40 0.00 0 0
Total 642.28 7.26 1.13