Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 852.08 0.09 0.01  
1 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 09 Nos. Piped W/S. Schemes under Purbasthali II Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000338/2024-2025 3018/BWD 05/08/2024 50 HORIZEN 23.70 0.09 0.38 10
2 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Work Order for "Restoration of Pipeline along with other ancillary work in connection with Retrofitting of Surface Water Based Piped Water Supply Scheme(SM/08030) for Zone III within Kalna Sub-Division under Burdwan Division, PHE Dte.". Assistant Engineer ORD/000521/2024-2025 9464/KSD 31/07/2024 15 IJABUL SEKH 3.13 0.00 0 0
3 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Augmentation of PURBASTHALI Surface Water Supply Scheme (ZONE-4B) with LDS, Rising Main, FHTC, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Purbasthali-II Block, District:- Purba-Bardhaman._2ND CALL Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000895/2023-2024 5371/BWD 07/12/2023 365 TAPAS KUMAR CHAKRABORTY & CO. 819.09 0.00 0 0
4 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE II , SM/16014 Augmentation Material Requisition To Resource Division RTOR000762/2023-2024 196/BWD 10/01/2024 Resource Division 6.16 0.00 0 0
Total 852.09 0.09 0.01