Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 84.81 8.48 10  
1 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Installation of air valve with valve Chamber and installation of pressure gauge for improvement of valve pressure at dist.line,repairing valve chamber with RCC cover slab and interconnection of valve chamber with upvc pipe for draining out waste water at Head work site of RASULPUR PWSS under Memari-I Dev.Block under Bardhaman Sadar south sub-Divn,PHE Dte Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000118/2024-2025 997/BSD 06/06/2024 30 DEBASHISH ENTERPRISE 0.83 0.00 0 0
2 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Sinking of 300 X 200mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for SASINARA Z-II W/S Scheme at Kalsi Mouza, RASULPUR W/S Scheme at 4th TW site & ALIPUR W/S Scheme at 4th TW site under Memari-I Block under within Burdwan Sub-Division, PHE Dte. [For 3 Nos. Tube well]. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000159/2023-2024 2455/BWD 31/05/2023 60 SUSUNIA GP CO. OPERATIVE LABOUR CONTRACT AND CONSTRUCTION SOCIETY LTD. 39.76 0.00 0 100
3 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Extension of height of Boundary Wall by Angle Rolled Section and Barbed Wire and Roof treatment of Pump house for Rasulpur and its Adjoining Mouza W/S Scheme, block -Memari-I within Burdwan Sub-Division ,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000300/2024-2025 1282/BSD 12/07/2024 60 GHOSH CONSTRUCTION 1.27 0.00 0 0
4 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Preparation and Submission of DPR for Augmentation of Rasulpur PWSS under Memari-I Development Block under Burdwan Division, P.H.E Dte.[2nd Call] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000395/2023-2024 1583/BSD 24/07/2023 15 GEO-SOLUTION 0.78 0.77 98.72 100
5 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Construction of switch rooms & Rising main at different TW site for RASULPUR Piped Water Supply Scheme under Memari - I Block, District:- Purba-Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/000881/2023-2024 5356/BWD 06/12/2023 60 SANDIP SARKAR 7.43 1.96 26.38 95
6 PURBA BARDHAMAN Burdwan Division AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Extension of pipe line and replacing damaged pipe line at Swayerpar Uttar for RASULPUR and its adj.mouza W/S Scheme,Block:Memari-I within Burdwan Sub-Division,PHE Dte Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, RWS, Memari-I Dev. Bolck ORD/001174/2023-2024 533/BSD 14/03/2024 30 DEBASHISH ENTERPRISE 0.93 0.00 0 0
7 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Quotation for New Electric Connection for Rasulpur Augmentation W/S Scheme TW No. - 4 BILL/01735/2023-2024 BP-2023-24-254 07/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 10.09 0.00 0 0
8 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augumentation of Rasulpur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000089/2023-2024 2594/CMD 07/06/2023 30 CHOUDHURY ENTERPRISE 22.76 5.27 23.15 50
9 PURBA BARDHAMAN Central Mechanical AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR RASULPUR , SM/15701 Augmentation Supply & installation of Automatic Chlorinator at Rasulpur water supply scheme, P.H. No.- II under CMD, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/001750/2023-2024 18/CMSD 04/01/2024 12 MS S M ELECTRICAL 0.96 0.48 50 100
Total 84.81 8.48 10