Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
12 | 438.34 | 46.27 | 10.56 | ||||||||||||||
1 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] | AE(HQs) | J.E. 1 BURDWAN | ORD/000442/2024-2025 | 306/AE/HQ | 31/05/2024 | 60 | MD HASIN | 0.80 | 0.77 | 96.25 | 0 |
2 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] | AE(HQs) | Contractual Junior Engineer | ORD/000507/2024-2025 | 547/AE/HQ | 01/08/2024 | 60 | MD HASIN | 0.80 | 0.74 | 92.5 | 0 |
3 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | MERA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] | Assistant Engineer | Junior Engineer, R.W.S., Katwa-I Dev. Block | ORD/000752/2022-2023 | 1209/BWD | 15/03/2023 | 365 | NABIN DEBNATH | 303.82 | 32.64 | 10.74 | 35 |
4 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] | AE(HQs) | J.E. 1 BURDWAN | ORD/001205/2023-2024 | 43/AE/HQ | 29/01/2024 | 60 | MD HASIN | 0.80 | 0.76 | 95 | 0 |
5 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] | AE(HQs) | J.E. 1 BURDWAN | ORD/001231/2023-2024 | 236/AE/HQ | 28/03/2024 | 60 | MD HASIN | 0.80 | 0.76 | 95 | 0 |
6 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Material Requisition To Resource Division | RTOR000066/2022-2023 | 1261/BWD | 17/03/2023 | Resource Division | 7.73 | 0.00 | 0 | 0 | |||
7 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Material Requisition To Resource Division | RTOR000109/2022-2023 | 1642/BWD | 06/04/2023 | Resource Division | 1.83 | 0.00 | 0 | 0 | |||
8 | PURBA BARDHAMAN | Katwa - I | Burdwan Division | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Material Requisition To Resource Division | RTOR000621/2023-2024 | 4879/BWD | 10/11/2023 | Resource Division | 31.56 | 0.00 | 0 | 0 | |||
9 | PURBA BARDHAMAN | Katwa - I | Central Mechanical | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | New Service connection for Mera PWSS TW-1 | BILL/02351/2023-2024 | BP-2023-24-462 | 30/01/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) | 2.98 | 0.00 | 0 | 0 | |||
10 | PURBA BARDHAMAN | Katwa - I | Central Mechanical | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | New service connection for MERA PWSS TW 2. | BILL/02446/2023-2024 | BP-2023-24-525 | 09/02/2024 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) | 5.08 | 0.00 | 0 | 0 | |||
11 | PURBA BARDHAMAN | Katwa - I | Central Mechanical | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman | Driller In-Charge | Junior Engineer | ORD/000069/2024-2025 | 2399/CMD | 02/08/2024 | 90 | SUBRATA BHADRA | 55.16 | 0.00 | 0 | 0 |
12 | PURBA BARDHAMAN | Katwa - I | Central Mechanical | MERA PIPE WATER SUPPLY SCHEME , SM/15575 | New | Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at MERA Water Supply Scheme [ Block- KATWA-I ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. | Driller In-Charge | Junior Engineer | ORD/000886/2023-2024 | 4149/CMD | 29/08/2023 | 30 | GOENKA ENTERPRISE | 26.98 | 10.60 | 39.29 | 91 |
Total | 438.33 | 46.28 | 10.56 |