Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 386 85.8 22.23  
1 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme KASHIARA PWSS (Sl No-5) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000073/2023-2024 397/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.62 2.62 100 100
2 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Augmentation of KASHIARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MONGALKOTE Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000753/2023-2024 4666/BWD 01/11/2023 365 M/S B. RAI CONSTRUCTION COMPANY 372.35 83.18 22.34 30
3 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF KASHIARA PIPED WATER SUPPLY SCHEME , SM/15562 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Kashiara Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000080/2023-2024 2580/CMD 07/06/2023 30 GLACIER ENGINEERING CO 11.03 0.00 0 0
Total 385.99 85.80 22.23