Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 731 161.54 22.1  
1 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Continuation work order for "Supply of one No. Diesel Driven Ambassador Car on hire basis for the office of the Assistant Engineer, Burdwan Sub-Division, PHE Dte. (Period from 01-06-2024 to 31-08-2024" JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000228/2024-2025 918/BSD 28/05/2024 92 SK. ASFIA 1.20 0.40 33.33 60
2 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New PIPULDAHA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Raina-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000458/2023-2024 3440/BWD 08/08/2023 365 SK ABDUL HALIM 644.77 155.32 24.09 55
3 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000371/2023-2024 2197/BWD 12/05/2023 Resource Division 3.55 0.00 0 0
4 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000417/2023-2024 3865/BWD 01/09/2023 Resource Division 20.78 0.00 0 0
5 PURBA BARDHAMAN Raina - II Burdwan Division Pipuldaha Piped Water Supply Scheme , SM/15488 New Material Requisition To Resource Division RTOR000687/2023-2024 5078/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
6 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New New electric connection for Pipuldaha PWSS. BILL/01868/2023-2024 BP-2023-24-346 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.54 0.00 0 0
7 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New New electric connection for Pipuldaha PWSS, PH-1. BILL/01883/2023-2024 BP-2023-24-345 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.76 0.00 0 0
8 PURBA BARDHAMAN Raina - II Central Mechanical Pipuldaha Piped Water Supply Scheme , SM/15488 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Pipuldaha Water Supply Scheme [ Block- Raina-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000728/2023-2024 4039/CMD 29/08/2023 30 ANANTA ELECTRICAL ENGINEERING CONSTRUCTION 28.94 5.82 20.11 0
Total 730.99 161.54 22.1