Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 882.6 150.73 17.08  
1 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Balance work for Balance work of OHR, construction Concrete Road, 1st Floor of Office Building, Functional Household Tap Connection, land development, Road restoration etc. of Gopekhanji, Jajigram & Gidhagram PWSS under KATWA -I Block, under Katwa Sub Division under Burdwan Divn, District:- Purba-Bardhaman. Assistant Engineer ORD/000503/2024-2025 3161/BWD 22/08/2024 120 POWER TOOLS & ENGINEERING 272.54 0.00 0 0
2 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New GOPKHANJI Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA -I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000741/2022-2023 1134/BWD 13/03/2023 365 POWER TOOLS & ENGINEERING 482.85 140.17 29.03 74
3 PURBA BARDHAMAN Katwa - I Burdwan Division GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Material Requisition To Resource Division RTOR000094/2022-2023 1962/BWD 25/04/2023 Resource Division 37.55 0.00 0 0
4 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New New service connection charges for Gopkhanji W/S Scheme TW-1 BILL/00696/2023-2024 BP-2023-24-39 27/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.65 0.00 0 0
5 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New New service connection charges for Gopkhanji PWSS TW-2 BILL/00822/2023-2024 BP-2023-24-100 03/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.87 0.00 0 0
6 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jajigram & others water supply scheme under Katwa-I Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman Driller In-Charge Junior Engineer ORD/000069/2024-2025 2399/CMD 02/08/2024 90 SUBRATA BHADRA 55.16 0.00 0 0
7 PURBA BARDHAMAN Katwa - I Central Mechanical GOPKHANJI PIPED WATER SUPPLY SCHEME , SM/15171 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at GOPKHANJI Water Supply Scheme [ Block- KATWA-1] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000127/2023-2024 2660/CMD 16/06/2023 30 JYOTY SOLAR POWER. 26.98 10.56 39.14 100
Total 882.60 150.74 17.08