Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,764.13 8.39 0.48  
1 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to CHAKULIA, KULSANA & HALIMPUR Piped Water Supply Scheme under MONGALKOTE Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer J.E. katwa,JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000461/2023-2024 3443/BWD 08/08/2023 365 ASHOK KUMAR GHOSH 1,588.10 0.00 0 15
2 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Supply, delivery, installation & hand hold demonstration of different equipments / machineries to test HDPE pipes as per IS: 4984-2016 at the pipe testing laboratory at Nababhat under Burdwan Division, PHE. Dte._2ND CALL AE(HQs) J.E. 1 BURDWAN ORD/001212/2023-2024 907/BWD 04/03/2024 30 MANASH GHOSH 23.87 0.00 0 100
3 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000032/2023-2024 1962/BWD 25/04/2023 Resource Division 1.38 0.00 0 0
4 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000288/2023-2024 2197/BWD 12/05/2023 Resource Division 7.80 0.00 0 0
5 PURBA BARDHAMAN Mangolkote Burdwan Division CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Material Requisition To Resource Division RTOR000713/2023-2024 5047/BWD 23/11/2023 Resource Division 19.78 0.00 0 0
6 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Quotation for new service connection for Chakulia PWSS TW-2. BILL/00253/2024-2025 BP-2024-25-133 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.10 0.00 0 0
7 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Quotation for new service connection for Chakulia PWSS TW-1. BILL/00255/2024-2025 BP-2024-25-134 05/06/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.57 0.00 0 0
8 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Additional quotation in second time against additional work at Chakulia PWSS TW-2 BILL/00683/2024-2025 BP-2024-25-268 21/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.31 0.00 0 0
9 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Jabagram & others water supply scheme under Mangalkote Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge Junior Engineer ORD/000118/2024-2025 2590/CMD 27/08/2024 90 M/S SAJAHAN CHOWDHURY 62.06 0.00 0 0
10 PURBA BARDHAMAN Mangolkote Central Mechanical CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System, Internal House Wiring and Compound lighting arrangement for Tube well No.- 1 & 2 at CHAKULIA Water Supply Scheme [BLOCK- MANGOLKOTE] under CMD, PHE Dte., Dist.- Purba-Bardhaman Driller In-Charge Junior Engineer ORD/001604/2023-2024 1534/CMD 05/03/2024 60 CHATTERJEE ENTERPRISE 28.81 0.00 0 0
11 PURBA BARDHAMAN Mangolkote Central Drilling CHAKULIA PIPE WATER SUPPLY SCHEME , SM/15162 New Providing drilling crew and other allied works for construction of Tube Well (250mm X150mm X 240 Mtrs. Depth) by utilizing Departmental Machineries for Chakulia W/S Scheme (T/W-I & II), Block- Mangolkote under Purba Bardhman District, Central Drilling Division, P.H.E. Dte. Assistant Engineer Junior Engineer ORD/000198/2023-2024 1339/CDD 13/09/2023 210 M/S SAIKAT ENTERPRISE 23.35 8.39 35.93 100
Total 1,764.14 8.39 0.48