Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 966.89 299.43 30.97  
1 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New NASIGRAM Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Bhatar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000050/2023-2024 1826/BWD 19/04/2023 365 MD HASIN 742.95 281.45 37.88 50
2 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/08/2023 to 31/10/2023] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000420/2023-2024 593/DSD 31/07/2023 66 AFIBS ENTERPRISE 0.85 0.83 97.65 100
3 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Continuation Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/11/2023 to 31/01/2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000755/2023-2024 825/DSD 31/10/2023 66 AFIBS ENTERPRISE 0.85 0.56 65.88 100
4 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Continuation Supply of Inspection Vehicle for inspection of different JJM related (Schemes) works as and when required including supply of driver & fuel (minimum 8 Hours duty per day) and all taxes etc. for Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. consider 96.00 Km. run per day.[Period from 01/11/2023 to 31/01/2024] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/001210/2023-2024 825/DSD 31/10/2023 66 AFIBS ENTERPRISE 0.85 0.28 32.94 100
5 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000071/2023-2024 1962/BWD 25/04/2023 Resource Division 27.18 0.00 0 0
6 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000176/2023-2024 2155/BWD 10/05/2023 Resource Division 17.06 0.00 0 0
7 PURBA BARDHAMAN Bhatar Burdwan Division NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Material Requisition To Resource Division RTOR000583/2023-2024 4897/BWD 10/11/2023 Resource Division 38.94 0.00 0 0
8 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New New service connection charges for Nasigram PWSS TW-1 BILL/00772/2023-2024 BP-2023-24-72 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.83 0.00 0 0
9 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New New service connection charges for Nasigram PWSS TW-2 BILL/00773/2023-2024 BP-2023-24-73 21/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.19 0.00 0 0
10 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New NEW SERVICE CONNECTION FOR NASIGRAM PWSS BILL/02592/2023-2024 BP-2023-24-574 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.54 0.00 0 0
11 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Karjana & others water supply scheme under Bhatar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000067/2024-2025 2394/CMD 02/08/2024 90 AHALYA ENGINEERING WORKS 82.00 0.00 0 0
12 PURBA BARDHAMAN Bhatar Central Mechanical NASIGRAM PIPED WATER SUPPLY SCHEME , SM/14443 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1, 2 & 3 at NASIGRAM Water Supply Scheme [ Block- BHATAR ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000141/2023-2024 2856/CMD 05/07/2023 30 M/S. S.R. ENTERPRISE 41.65 16.31 39.16 90
Total 966.86 299.44 30.97