Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 582.13 284.25 48.83  
1 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New AKHARA Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under KATWA-II Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000011/2023-2024 1725/BWD 13/04/2023 365 MANASH GHOSH 455.23 267.95 58.86 78
2 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000179/2023-2024 2155/BWD 10/05/2023 Resource Division 14.84 0.00 0 0
3 PURBA BARDHAMAN Katwa - II Burdwan Division AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Material Requisition To Resource Division RTOR000630/2023-2024 4882/BWD 10/11/2023 Resource Division 26.00 0.00 0 0
4 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New New service connection charges for Akhra PWSS TW-1 BILL/00756/2023-2024 BP-2023-24-56 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.96 0.00 0 0
5 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New New service connection charges for Akhra PWSS TW-2 BILL/00757/2023-2024 BP-2023-24-57 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 2.39 0.00 0 0
6 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Mulgram & others water supply scheme under Katwa-II Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000070/2024-2025 2409/CMD 02/08/2024 90 DUTTA ENTERPRISE 50.18 0.00 0 0
7 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Akhra Water Supply Scheme [ Block- KATWA-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000135/2023-2024 2760/CMD 28/06/2023 30 CHOUDHURY ENTERPRISE 27.73 15.90 57.34 40
8 PURBA BARDHAMAN Katwa - II Central Mechanical AKHRA PIPED WATER SUPPLY SCHEME , SM/14057 New Hiring of Inspection Vehicle (Diesel/CNG/LPG Driven) for supervision of site for the office of Assistant Engineer, under C.M.D. P.H.E. Dte. w.e.f.- 01/11/2023 to 31/12/2023. [Under JJM Works]. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/001302/2023-2024 859/CMSD 30/10/2023 61 SUBRATA BHADRA 0.80 0.40 50 100
Total 582.13 284.25 48.83