Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 2,097 93.21 4.44  
1 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to PASCHIM KHARAMPUR, SHUSHNA & SIGHNALI Piped Water Supply Scheme under Manteswar Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000482/2023-2024 3494/BWD 09/08/2023 365 S.P. CONSTRUCTION 1,925.07 93.21 4.84 60
2 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Material Requisition To Resource Division RTOR000321/2023-2024 2197/BWD 12/05/2023 Resource Division 15.55 0.00 0 0
3 PURBA BARDHAMAN Manteswar Burdwan Division SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Material Requisition To Resource Division RTOR000453/2023-2024 3977/BWD 08/09/2023 Resource Division 38.31 0.00 0 0
4 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New New service connection for SIGHNALI PWSS TW 1. BILL/02445/2023-2024 BP-2023-24-519 09/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.24 0.00 0 0
5 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New NEW SERVICE CONNECTION FOR SIGHNALI PWSS. BILL/02692/2023-2024 BP-2023-24-571 27/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.01 0.00 0 0
6 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Sutra & others water supply scheme under Monteswar Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000068/2024-2025 2396/CMD 02/08/2024 90 SINHA ELECTRICALS 78.06 0.00 0 0
7 PURBA BARDHAMAN Manteswar Central Mechanical SIGHNALI PIPED WATER SUPPLY SCHEME. , SM/13496 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Sighnali Water Supply Scheme [ Block- Monteshwar ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000743/2023-2024 4053/CMD 29/08/2023 30 ASHIM UDYOG 27.76 0.00 0 0
Total 2,097.00 93.21 4.44