Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 333.11 224.01 67.25  
1 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Providing Functional Household Tap Connection (FHTC) from existing distribution system with within the command area of augmentation BHALKI Piped Water Supply Scheme at Bhalki (Part), Chandipur (Part), Samantapara (Part), Telota (Part) & Abhirampuri (Part) village, habitation, Ausgram-II Block within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000006/2022-2023 1907/BWD 07/04/2022 30 ROY CONSTRUCTION 49.52 0.00 0 1
2 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Restoration of Pipeline by Re-Laying of Pipe Line for Rejuvenation of BHALKI and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block under Burdwan Division, P.H.E. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000104/2021-2022 3877/BWD 27/07/2021 60 ASHOK KUMAR GHOSH 279.81 220.32 78.74 1
3 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Construction of Drain and restoration of connection for Augmentation of BHALKI W/S Scheme , Block- Ausgram-II, under Durgapur (Burdwan North)Sub Division Burdwan Division, P.H.E. Dte. [SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000121/2022-2023 334/DSD 27/06/2022 30 TAUSIF HOSSAIN MONDAL 1.88 1.87 99.47 1
4 PURBA BARDHAMAN Burdwan Division Rejuvenation of Bhalki Water Supply Scheme. , SM/09103 Augmentation Making structure with GI pipe for provision of joining and laying of pipeline near Abhirampur branch Canal for Bhalki and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000134/2022-2023 349/DSD 30/06/2022 45 PARTHA RAY 1.90 1.82 95.79 1
Total 333.11 224.02 67.25