Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
22 364.22 302.18 82.97  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village (Purba para,Pal para,Kana para,Pandit para, pashim para)within Raina-II Block, under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000031/2022-2023 678/BSD 22/04/2022 30 BAMDEB CONSTRUCTION & CO 2.84 2.83 99.65 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Land Development(at entrance)of Head Works Site of of KAMARHATI ZONE-II PIPED Water Supply Scheme at RAINA-II Block within Burdwan Sub-Division under Burdwan Division, PHE Dte. Group : F. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000108/2022-2023 988/BSD 16/06/2022 15 JMD ENGINEERING INFRASTRUCTURE COMPANY 1.85 0.00 0 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(70 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000110/2022-2023 1015/BSD 20/06/2022 30 KONAR ENTERPRISE 4.95 4.85 97.98 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village(80 NOS) of Raina-II Block,under Burdwan Division, PHE Dte. Group : C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000111/2022-2023 1016/BSD 20/06/2022 30 D.M. ENTERPRISE 4.94 4.91 99.39 1
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Pipeline with FHTC for KAMARHATI ZONE -II Water Supply Scheme at Kamarhati village (52 Nos.) of Raina-II Block,under Burdwan Division, PHE Dte. Group : A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000113/2022-2023 1035/BSD 20/06/2022 30 KOUSIK MALLICK 4.96 4.80 96.77 1
6 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Laying pipeline with FHTC for KAMARHATI Zone -II Water Supply Scheme at Kamarhati village (95 Nos.), Barati village (155 Nos.), Baidyapur village (110 Nos.), Jashapur village (125 Nos.) of Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000164/2022-2023 3166/BWD 21/07/2022 45 ANWESHA CONSTRUCTION 31.48 31.37 99.65 1
7 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000214/2021-2022 1476/BSD 09/11/2021 30 MUNSHI JAVEDUR JAMAN 4.83 4.83 100 1
8 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000215/2021-2022 1477/BSD 09/11/2021 30 DUBE ENTERPRISE 4.83 4.80 99.38 1
9 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Kamarhati Z-II Piped Water Supply Scheme at Gotan, Kamarhati & Jashapur Village (Mouza), Raina-II Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000235/2021-2022 6535/BWD 24/11/2021 60 KOUSIK MALLICK 71.10 66.22 93.14 1
10 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-A.Gr. D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000307/2021-2022 1686/BSD 17/12/2021 30 MUNSHI JAVEDUR JAMAN 4.83 4.83 100 1
11 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Continuation work order for Water tap connection in each house hold from existing dist. System within Scheme jurisdiction in Katshimul village (Part) of Kamarhati (Zone-II) piped water supply scheme within Burdwan Sub-Division PHE Dte Part-B..Gr. E. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000308/2021-2022 1685/BSD 17/12/2021 30 DUBE ENTERPRISE 4.83 4.83 100 1
12 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting FHTC for Kamarhati (Zone-II) Water Supply Scheme at Kamarhati Village (36 Nos) of Raina II Block under Burdwan Division, PHE Dte [For 100% FHTC at Kamarhati Village (Harghar Jal). Gr.J Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000342/2022-2023 1367/BSD 04/08/2022 5 ANWESHA CONSTRUCTION 0.98 0.00 0 1
13 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting 225mm.Dia UPVC Pipeline at Node 11A to 11B of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000387/2021-2022 58/BSD 13/01/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 2.99 0.00 0 1
14 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting 225mm.Dia UPVC Pipeline at Node 86C-92,86-B-86C,86-A-86B,10-11-53-53A of KAMARHATI(Zone-I)Water Supply Scheme within Raina-II Block , under Burdwan Division, PHE Dte. Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000388/2021-2022 59/BSD 13/01/2022 30 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 3.96 3.92 98.99 1
15 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Barati and Badyapur village within Raina-II Block , under Burdwan Division, PHE Dte(Zone-II). Gr.D. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000442/2021-2022 200/BSD 01/02/2022 30 ARISTOCON ENGINEERS CO-OP SOCIETY LTD 4.80 4.74 98.75 1
16 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Jashapur village within Raina-II Block , under Burdwan Division, PHE Dte.Gr.C. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000465/2021-2022 276/BSD 15/02/2022 30 KOUSIK MALLICK 4.99 4.98 99.8 1
17 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at Kamarhati village within Raina-II Block , under Burdwan Division, PHE Dte. (Zone-II). Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000549/2021-2022 369/BSD 02/03/2022 30 DUBE ENTERPRISE 4.98 4.97 99.8 1
18 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Bullah pilling (92.0 mtr) at HD Works Site(North,East & South) for protection of Boundary wall beside irrigation canel of KAMARHATI ZONE-II W/S Scheme of RAINA-II Block at Burdwan Sub -Division within Burdwan Division, PHE Dte. Dist.-Purba Bardhaman.Gr.B. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000644/2021-2022 468/BSD 21/03/2022 15 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.61 0.00 0 1
19 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting FHTC for KAMARHATI (Zone-II] Water Supply Scheme at Kamarhati village (36 Nos) of Raina-II Block under Burdwan Division, PHE Dte. [for 100% FHTC at Kamarhati village (Harghar Jal)] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000653/2022-2023 1367-A/BSD 04/08/2022 5 ANWESHA CONSTRUCTION 0.98 0.98 100 1
20 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Extension of pipeline for KAMARHATI Water Supply Scheme FOR FHTC work at GOTAN village within Raina II Block, under Burdwan Division, PHE Dte. Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000674/2021-2022 534/BSD 28/03/2022 30 KOUSIK MALLICK 4.96 4.96 100 1
21 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Laying of interconnection of the Pump No.-1 & 2 with OHR and distribution main of 300 mm dia for Kamarhati (Zone-II) piped water supply scheme within Raina-II Block under Burdwan Division, PHE Dte.[Gr.-H] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000690/2021-2022 959/BSD 23/07/2021 30 JMD ENGINEERING INFRASTRUCTURE COMPANY 4.80 0.00 0 1
22 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of KAMARHATI Piped Water Supply Scheme at RAINA-II Block under Burdwan Division, P.H.E. DTE. , SM/08709 Retrofitting Formal Work Order for Laying distribution system including providing house connection at Nizampur, Daminya village (Mouza) of KAMARHATI Piped W/S. Scheme (Zone-I) at Raina - II Block under Burdwan Division, PHE. Dte.(Part-B) _2ND CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000934/2020-2021 1601/BWD 22/02/2021 90 INDIAN ENGINEERS CO.-OPERATIVE SOCIETY LTD. 184.73 143.36 77.61 100
Total 364.23 302.18 82.96