Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 103.49 50.24 48.55  
1 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Amra Piped Water Supply Scheme at Amra (2 Nos Habitation Part) & Dogachia Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte._3rd CALL. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000008/2021-2022 3138/BWD 03/06/2021 45 D.M. ENTERPRISE 57.42 28.82 50.19 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing FHTC for Dogachia Mouza [(Habitation (Village)] for AMRA piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000068/2023-2024 2019/BWD 28/04/2023 30 DEY NIRMAN 20.61 9.00 43.67 100
3 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Laying of 100 mm dia D.I Pipe for Road widening from 4 lane to 6 lane of NH2 at chainage 596+286 & 596+086 & 596+ 486 at Amra Water supply within Jamalpur Block,under Burdwan Division,PHE Dte". Group : A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000101/2022-2023 982/BSD 16/06/2022 30 DEY NIRMAN 2.89 0.00 0 0
4 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Construction of concrete road and rest portion of boundary wall at Head works site of AMRA Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 122 Mtr., 45 Nos Column). Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000146/2022-2023 3100/BWD 14/07/2022 30 CHAUDHURI ENTERPRISE 7.68 7.74 100.78 0
5 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of AMRA Piped Water Supply Scheme (Vill-Dogechia, Habitation- Dogechia ) at Jamalpur Block of Burdwan Sub-Division under Burdwan Division, PHE Dte.Gr.A. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000386/2021-2022 57/BSD 13/01/2022 30 DEY NIRMAN 4.81 0.00 0 1
6 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Construction of Boundary wall at 3rd Tube well site of Dogachia Mouza of Amra water supply scheme under Jamalpur block under Burdwan Division, PHE Dte. [Length-59 Mtr][Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000557/2021-2022 1028/BSD 05/08/2021 45 MUKHERJEE ENTERPRISE 4.45 0.00 0 1
7 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Extension of pipeline at AMRA water supply scheme at different villages (Tengaberia, Badpur & Kolupukur) FHTC of Jamalpur Block under Burdwan Division, PHE Dte.[Gr.-F] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000561/2021-2022 1374/BSD 05/10/2021 30 D.M. ENTERPRISE 4.74 3.81 80.38 1
8 PURBA BARDHAMAN Burdwan Division Providing Functional House hold Tap Connection (FHTC) by retrofitting at Dogachia mouza within the command area of Amra piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE. (Pt.-B) , SM/08702 Retrofitting Repairing and replace of damaged UPVC Pipeline with installation and construction of valve chamber for control of water flow within command area of AMRA Piped W/S Scheme at Dogachia habitation,Jamalpur Development Block under Burdwan Division,PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR ORD/000806/2022-2023 429/BSD 15/03/2023 30 DEY NIRMAN 0.89 0.87 97.75 100
Total 103.49 50.24 48.55