Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 57.69 9.84 17.06  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-163/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000088/2020-2021 2690/BWD 07/08/2020 30 LAKSHMIKANTA DAS 4.92 4.92 100 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura piped water supply scheme within Headquarters under Burdwan Division, PHE Dte. [Phase-I](Tr No.-238/BWD/2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000095/2020-2021 2689/BWD 07/08/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 4.92 100 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Continuation work order for Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3A¿] (Agreement no. 163/BWD,2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000135/2020-2021 3535/BWD 25/09/2020 30 LAKSHMIKANTA DAS 2.69 0.00 0 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Jagarpur & Mugura village of Mugura Piped Water Supply Scheme within Headquarters under Burdwan Division, PHE. Dte. [Phase - I] [GROUP : ¿3B¿] (Agreement no.238/BWD of 2020-21) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000136/2020-2021 4118/BWD 16/10/2020 30 HAFIJUR RAHAMAN MIDYA 4.92 0.00 0 1
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Mugura PWSS , SM/06747 Retrofitting Laying Parallel Pipeline to improve drinking water supply, Construction of Boundary wall, Path Way, Drain at Head Work Site & 2nd TW Site and providing leftout FHTC, Road Restoration with allied work for MUGRA Piped Water Supply Scheme, Block- Raina-I, within Burdwan Sub Division under Burdwan Division PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000279/2024-2025 2711/BWD 11/07/2024 90 M/S PURBASHA 40.24 0.00 0 0
Total 57.69 9.84 17.06