Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 111.14 45.29 40.75  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Construction of Retaining wall for protection of soil erosion at Headwork site (Western Side) at TEANDUL Piped Water Supply Scheme under Burdwan Division, PHE Dte. [Group : B] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000035/2022-2023 241/AE/HQ 20/04/2022 30 ROY CONSTRUCTION 4.82 0.00 0 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of TEANDUL Piped Water Supply Scheme at Raina-I Block under Burdwan Division, PHE Dte.(Agreement No. 61/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000112/2020-2021 4881/BWD 07/12/2020 90 ASHOK KUMAR GHOSH 70.51 45.29 64.23 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Construction of Retaining wall for protection of soil erosion at Headwork site (southern side) at Teandul PWSS under Burdwan Division, PHE Dte. [Group: ¿H¿] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000224/2021-2022 1902/AE/HQ 16/11/2021 30 ASHOK KUMAR GHOSH 4.50 0.00 0 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting at Teandul PWSS , SM/06746 Retrofitting Extension Pipeline with Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Madhuban, Sultanbad, Dhamas & Teyandul of TEANDUL Piped Water Supply Scheme within Raina I Block of Burdwan Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000754/2022-2023 1228/BWD 17/03/2023 60 M/S UNIQUE 31.31 0.00 0 0
Total 111.14 45.29 40.75