Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Showing 1 to 17 of 17 entries
Sl No.District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrustedName of JE entrustedSystem Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
17 5,274.7200 
Sl No.
District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted
Name of JE entrusted
System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
17
5,274.72
0
0
 
Total
5,274.71
0.00
0
 
1 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Additional quotation for effecting NSC at Pump house at Taherpur (Shikarpur) PWSS (Zone-II) BILL/00339/2024-2025 BP-2024-25-152 27/03/2025 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.80 0.00 0 0
2 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Acceptance cum Formal Work Order for the work of Trial bore with necessary allied work and supply and delivery of office furnitures for the new office setup of the EE/DWSD/PHE Dte. at Nababhat,Purba bardhaman.in connection with Taherpur W/S Scheme under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000038/2024-2025 750/DWSD 05/06/2024 90 K.M. ENTERPRISE 3.83 0.00 0 100
3 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Acceptance cum Formal Work Order for the work of " Construction of Additional Store Room at Nababhat Office Building under Galsi-II Pipe Water Supply Scheme (JJM) under Durgapur W/S Division, PHE Dte Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000046/2024-2025 764/DWSD 06/06/2024 90 KIRON ENTERPRISE 17.08 0.00 0 30
4 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for the work of Sinking of 3 nos 300 x 200mm dia Tube Well-150 mtr and 7 Nos 200 x 200 mm dia River Bank Tube Well- 51 mtr with Construction of Pump House Cum Switch Room Chlorine Room under TAHERPUR PWSS (JJM) Block- Galsi-II, Distric- Purba Bardhaman under Durgapur W/S Division, PHE Dte Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000093/2024-2025 1000/DWSD 11/07/2024 340 S & P ENTERPRISE 102.54 0.00 0 60
5 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for Laying of Rising Main including Jack Pushing and construction of Pipe Carring Bridge with Pipe supporting structure under TAHERPUR and KHANO Piped Water Supply Scheme under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000158/2024-2025 1506/DWSD 05/11/2024 236 MANASH GHOSH 1,114.23 0.00 0 60
6 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for Additional Work of Soil investigation and construction of CWR cum Pump House with M.S structural work, Substation, Chlorine Room etc. Land Development of H/W site, drain and internal path way, concrete road and Bituminous Road Restoration, laying of M.S pipe, FHTC with platfrom and necessary allied works of Sub Surface based Taherpur and Khano PWSS (JJM) under Galsi-II Block, Dist- Purba Bardhaman, under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000161/2024-2025 1507/DWSD 05/11/2024 180 S & P ENTERPRISE 811.59 0.00 0 0
7 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Acceptance cum Formal Work Order for Preparation and Submission of Structural Design Calculation (Civil) & Structural drawing of Proposed CWR with M.S Structural Pump House over cwr, WBSEDCL Mettering Room and - PDB Room -2 Nos, Transformer yeard -2 nos, Chlorin Room -1 No with General Arrangement Drawing of Internal Road - Drain & necessary Soil investigation at Intake Site of "THERPUR (Zone-I, II, III) and KHANO (Zone I & II) PWSS (6 Copy) under Durgapur W/s Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000192/2024-2025 1608/DWSD 26/11/2024 45 DAFFODIL 9.48 0.00 0 90
8 PURBA BARDHAMAN Galsi - II Durgapur W/S Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Formal Work Order for the work of " Sinking of 3 nos. 300 x 200 mm dia T/W- 150 mtr and 7 nos 200 x 200 mm dia River Bank T/W- 51 mtr with Construction of P/H cum switch room under Taherpur PWSS (JJM) Block- Galsi-II, Dist- Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000317/2023-2024 377/DWSD 15/03/2024 90 S & P ENTERPRISE 0.00 0.00 NAN 0
9 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Sub Surface Based Piped Water Supply Scheme with LDS, FHTC, Construction of different capacity RCC OHRs with 20.0 mtr. with Staging height including soil investigation, Construction of CWR, Chlorine Room, Guard Room, Sub Station Building, High Lift Pump House Boundary walls with gates, land development, drain and internal pathway of TAHERPUR Piped Water Supply Scheme under Galsi-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000479/2023-2024 3760/BWD 29/08/2023 730 S & P ENTERPRISE 2,282.69 0.00 0 50
10 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Hydro-geological study of Sub Surface Water Flow/Storage Characteristics for Creation of Sustainable Source and Estimation of Sustainable Yield (5 Nos of Schemes) in Purba Bardhaman District, West Bengal towards implementation of water supply project. ORD/000872/2023-2024 5324/BWD 01/12/2023 120 THE REGISTRAR JADAVPUR UNIVERSITY 113.34 0.00 0 100
11 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Material Requisition To Resource Division RTOR000329/2023-2024 2197/BWD 12/05/2023 0 Resource Division 55.90 0.00 0 0
12 PURBA BARDHAMAN Galsi - II Burdwan Division TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Material Requisition To Resource Division RTOR000400/2023-2024 3831/BWD 01/09/2023 0 Resource Division 269.94 0.00 0 0
13 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Quotation for new service connection for Taherpur PWSS TW - 2 (Z-I) BILL/00296/2024-2025 BP-2024-25-146 19/06/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.26 0.00 0 0
14 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Quotation for new service connection at Taherpur PWSS TW-3 BILL/01092/2024-2025 BP-2024-25-404 22/11/2024 0 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.08 0.00 0 0
15 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Providing Mechanical/Electrical equipment with all ancillaries and auxiliaries including intake (Low lift) pumping machineries, High Lift pumping machineries, 0-1 kg/hour gaseous chlorination system and illumination arrangement of Taherpur & Khano Sub-Surface Based Piped Water Supply Scheme under Purba Bardhaman District PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000002/2025-2026 904/CMD 04/04/2025 75 SINHA ELECTRICALS 329.09 0.00 0 0
16 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for OHR SITE of Zone-1, 2, & 3 at TAHERPUR Water Supply Scheme [ BLOCK- Galsi-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000560/2024-2025 3102/CMD 11/12/2024 60 M/S, S.S. ENTERPRISE. 38.16 0.00 0 0
17 PURBA BARDHAMAN Galsi - II Central Mechanical TAHERPUR PIPED WATER SUPPLY SCHEME , SM/18478 New Supply, installation, commissioning of Electro-Mechanical and instrumentation components at newly constructed Boosting Station under Taherpur-khano sub surface water supply scheme under Central Mechanical Division PHE Dte. ASSISTANT ENGINEER Junior Engineer ORD/000784/2024-2025 480/CMD 06/02/2025 75 GLACIER ENGINEERING CO 105.71 0.00 0 0
Total 5,274.710.000 