Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 1,021.16 198.97 19.48  
1 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Acceptance cum Formal Work Order for the work of " Balance work for sinking of 250 x 150mm dia T/W, P/H, Boundary wall, DI RM and LLDS for proposed 3rd T/W and other allied works under Sauta PWSS, Block- Aushgram-II, Dist-Purba Bardhaman under Durgapur W/S Division, PHE Dte. Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000001/2024-2025 768/DWSD 06/06/2024 45 SAIKAT RAY 94.93 27.23 28.68 40
2 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Acceptance cum Formal Work Order for Balance works of 160 mm dia HDPE rising main at JOYRAMPUR area and etc. allied works at SUATA of Ausgram -II Block of SUATA W/S Scheme (JJM) under Durgapur Water Supply Division, PHE Dte. Assistant Engineer-II JUNIOR ENGINEER-1 ORD/000099/2024-2025 1012/DWSD 16/07/2024 90 SAIKAT RAY 67.88 0.00 0 0
3 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New SUATA Piped Water Supply Scheme with sinking of Tube-well, LDS,Rising Main, FHTC, Construction of 400 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under Aushgram-II Block, District:- Purba-Bardhaman [NEW SCHEME] ORD/000494/2023-2024 3524/BWD 10/08/2023 365 SAIKAT RAY 615.97 160.71 26.09 45
4 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000058/2023-2024 1962/BWD 25/04/2023 Resource Division 46.65 0.00 0 0
5 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000326/2023-2024 2197/BWD 12/05/2023 Resource Division 13.13 0.00 0 0
6 PURBA BARDHAMAN Ausgram - II Burdwan Division SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Material Requisition To Resource Division RTOR000620/2023-2024 4887/BWD 10/11/2023 Resource Division 30.36 0.00 0 0
7 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New QUOTATION FOR NEW SERVICE CONNECTION FOR SUATA (ADDL TW)PWSS, TW 2 BILL/00328/2024-2025 BP-2024-25-162 01/07/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.68 0.00 0 0
8 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New New service connection charges for Suata PWSS TW-2 BILL/01701/2023-2024 BP-2023-24-233 20/11/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 9.29 0.00 0 0
9 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Quotation for new service connection at Suata W/S Scheme for PH No-1. BILL/01821/2023-2024 BP-2023-24-331 03/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.43 0.00 0 0
10 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
11 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at SUATA Water Supply Scheme [ BLOCK- AUSGRAM-II ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000157/2024-2025 2622/CMD 30/08/2024 60 SWAPAN BANERJEE 12.79 0.00 0 0
12 PURBA BARDHAMAN Ausgram - II Central Mechanical SUATA PIPED WATER SUPPLY SCHEME , SM/14974 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Suata Water Supply Scheme [ Block- Ausgram-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000748/2023-2024 4058/CMD 29/08/2023 30 DEY ENTERPRISE 27.79 11.03 39.69 96
Total 1,021.16 198.97 19.48