Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 594.36 217.09 36.53  
1 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Sinking of Tube-wells, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation, construction of switch rooms, boundary walls with gates, land development, internal drains and internal pathways at different TW sites for DIGHA Piped Water Supply Scheme under Ausgram-I Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000463/2023-2024 3454/BWD 08/08/2023 365 APORUPA CONSTRUCTION 423.95 205.39 48.45 20
2 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000022/2023-2024 1962/BWD 25/04/2023 Resource Division 55.76 0.00 0 0
3 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000245/2023-2024 2197/BWD 12/05/2023 Resource Division 12.65 0.00 0 0
4 PURBA BARDHAMAN Ausgram - I Burdwan Division DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Material Requisition To Resource Division RTOR000587/2023-2024 4944/BWD 10/11/2023 Resource Division 34.27 0.00 0 0
5 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New NEW SERVICE CONNECTION FOR DIGHA PWSS BILL/02588/2023-2024 BP-2023-24-554 20/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.08 0.00 0 0
6 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New NEW SERVICE CONNECTION FOR DIGHA PWSS PH-1. BILL/03138/2023-2024 BP-2023-24-648 20/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.12 0.00 0 0
7 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DIGHA Water Supply Scheme [ Block- AUSGRAM-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000808/2023-2024 4093/CMD 29/08/2023 30 A.S. ENTERPRISE 29.55 11.70 39.59 48
8 PURBA BARDHAMAN Ausgram - I Central Mechanical DIGHA PIPED WATER SUPPLY SCHEME , SM/13938 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at DIGHRA Water Supply Scheme [ Block- RAINA-2] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000841/2023-2024 4113/CMD 29/08/2023 30 GOENKA ENTERPRISE 28.98 0.00 0 0
Total 594.37 217.09 36.52