Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 1,563.45 354.46 22.67  
1 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Continuation order for Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-II under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.09.2024 to 28.02.2025 (6 Months)(Sl-02) Assistant Engineer-II JUNIOR ENGINEER-2 ORD/000139/2024-2025 1249/DWSD 30/08/2024 180 PRAMIT CHATTERJEE 0.82 0.40 48.78 0
2 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Hiring of LUXURY Diesel Ambassador Car (Inspection Vehicle) for using of the Assistant Engineer-II under office of the Executive Engineer, Durgapur Water Supply Division, Public Health Engineering Dte at Fagupur, Nababhat, Purba Bardhaman for the period of 01.03.2024 to 31.08.2024 (6 Months)(Sl-02) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000295/2023-2024 268/DWSD 29/02/2024 6 PRAMIT CHATTERJEE 0.82 2.38 290.24 0
3 PURBA BARDHAMAN Ausgram - II Durgapur W/S Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Acceptance cum Formal Work Order work of Balance work for renovation and modification of administrative office building at PHE Complex 2nd Floor, Nababhat, P.O- Fagupur, Dist- Purba Bardhaman inconnection with Augmentation of Chhora PWSS under Aushgram-II Block. Assistant Engineer-I JUNIOR ENGINEER-2 ORD/000301/2023-2024 364/DWSD 15/03/2024 30 SANDIPAN SENGUPTA 9.60 3.94 41.04 100
4 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to KHANDARI & CHHORA Piped Water Supply Scheme under Ausgram II Block, District:- Purba Bardhaman [NEW SCHEME] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000735/2022-2023 1005/BWD 06/03/2023 365 M/S NATIONAL CONSTRUCTION 1,331.54 335.58 25.2 90
5 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000083/2022-2023 1268/BWD 17/03/2023 Resource Division 16.43 0.00 0 0
6 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000095/2022-2023 1644/BWD 06/04/2023 Resource Division 43.68 0.00 0 0
7 PURBA BARDHAMAN Ausgram - II Burdwan Division CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Material Requisition To Resource Division RTOR000639/2023-2024 5105/BWD 23/11/2023 Resource Division 24.22 0.00 0 0
8 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New New service connection charges of Chhora PWSS TW-1 BILL/00746/2023-2024 BP-2023-24-48 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 6.21 0.00 0 0
9 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New New service connection charges of Chhora PWSS TW-2 BILL/00747/2023-2024 BP-2023-24-47 13/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.44 0.00 0 0
10 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at CHHORA Water Supply Scheme [ Block- AUSGRAM-2 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000054/2023-2024 2514/CMD 02/06/2023 30 MITRA ENTERPRISE 29.43 12.16 41.32 45
11 PURBA BARDHAMAN Ausgram - II Central Mechanical CHHORA PIPED WATER SUPPLY SCHEME , SM/13328 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Chora, Kalaijhuti & others water supply scheme under Ausgram-2 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. Driller In-Charge JUNIOR ENGINEER ORD/000143/2024-2025 2405/CMD 02/08/2024 90 NABAUDYOG ELECTRICAL ENGINEERING CO-OPERATIVE SOCIETY LTD 95.26 0.00 0 0
Total 1,563.46 354.45 22.67