Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 86.64 38.21 44.1  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Laying parallel pipeline to increase the water supply towards Kaldanda of PUBER and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000132/2022-2023 344/DSD 30/06/2022 30 ANWESHA CONSTRUCTION 4.81 4.81 100 1
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Extension of pipeline including water tap connection (FHTC) at Pubar Vill [Kamalpur & Pubar (Part) Hab.] of PUBAR and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000175/2021-2022 6105/BWD 08/10/2021 30 ANWESHA CONSTRUCTION 29.76 0.00 0 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Extension of pipeline including water tap connection (FHTC) at Pubar Vill [Kamalpur & Pubar (Part) Hab.] of PUBAR and its adjoining mouza's Piped W/S Scheme at Ausgram-II Block within Durgapur Sub Division under Burdwan Division, P.H.E. Dte._2ND CALL Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000193/2021-2022 6104/BWD 08/10/2021 30 ANWESHA CONSTRUCTION 29.76 29.22 98.19 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Water tap connection in each house hold from existing distribution system within scheme jurisdiction in Pubar (Part) village (Pubar (Part) habitation) of Pubar Piped Water Supply Scheme within Durgapur Sub-Divn. under Burdwan Division, PHE. Dte. [Sl. No. : ¿16¿] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000420/2020-2021 66/BWD 05/01/2021 15 SUBRATA GUPTA 4.86 0.36 7.41 1
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Extension of Pipeline with Providing Functional Household Tap Connection (FHTC) within the command area of PUBER Piped Water Supply Scheme , Block- Ausgram-II within Durgapur (Burdwan North) Sub Division under Burdwan Division, P.H.E. Dte. [Gr.-E] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000457/2021-2022 77/DSD 11/02/2022 30 ANWESHA CONSTRUCTION 4.75 2.94 61.89 1
6 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-II Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000472/2021-2022 940/BWD 17/02/2022 30 NANDY UDYOG 11.82 0.00 0 0
7 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Pubar Piped Water Supply Scheme at Ausgram-II Block , SM/07807 Retrofitting Relaying of pipeline damaged by construction of Road/Drain etc. at different location of Pubar and its adjoining mouzas water supply scheme at Ausgram-II Block within Durgapur Sub-Division, under Burdwan Division, PHE Dte. [SL-20] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer1, Durgapur Sub-Division, PHE Dte. ORD/000862/2022-2023 719/DSD 30/12/2022 30 ASRUL HAQUE MONDAL 0.88 0.88 100 100
Total 86.66 38.20 44.09