Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 105.76 70.02 66.21  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Modification to the distribution network by making a loop to augment the water supply to FHTC at Gopinathbati village of Dwariyapur and its adjoining mouzas W/S Scheme under Durgapur Sub-Division, Burdwan Division, P.H.E. Dte._2nd call[SL-05] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer2, Durgapur Sub-Division, PHE Dte. ORD/000057/2023-2024 180/DSD 18/04/2023 21 ANIRUDDHA FARUQUE 0.92 0.92 100 100
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Restoration of damaged pipeline of distribution main at Laxmiganj village and laying of parallel line at Gonna village for providing FHTC within Dwariapur W/S Scheme in Ausgram-II Block under Burdwan Division, P.H.E. Dte. [Gr.-G] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000336/2021-2022 06/DSD 03/01/2022 30 RANADHIR SINHA 2.11 2.11 100 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Providing leftout water tap connection in different villages for 100% coverage to make it Sajal Gram from existing distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Ausgram-I Block under Burdwan Division, PHE. Dte. Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000366/2021-2022 120/BWD 07/01/2022 30 ANIRUDDHA FARUQUE 12.33 12.56 101.87 1
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Restoration of damaged concrete road in connection with laying distribution system at Laxmiganj, Gonna and Gopinathbati village within Dwariapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte. [Gr.-H] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000451/2021-2022 80/DSD 11/02/2022 15 RANADHIR SINHA 4.73 4.73 100 1
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Making Connection with Rising Main And Over Head Reservoir of Dwariapur W/S Scheme within Durgapur Sub-Division in Ausgram-I Block under Burdwan Division, P.H.E. Dte.[Gr.-C] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000551/2021-2022 133/DSD 02/03/2022 15 RANADHIR SINHA 0.34 0.00 0 1
6 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Dwariapur Piped Water Supply Scheme at Gonna (1 No. Habitation), Alutia (Part), Dwariapur (7Nos Habitation) & Lakshmiganj (5 Nos Habitation) Village (Mouza), Ausgram-I Block under Burdwan Division, PHE Dte.[Agreement No. 109/2020-2021 OF SE/CC/PHE. DTE.] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000601/2020-2021 1600/BWD 22/02/2021 60 RANADHIR SINHA 81.21 45.58 56.13 1
7 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) under the command area of Dwariapur Piped Water Supply Scheme , SM/07548 Retrofitting Restoration of damaged concrete road in connection with providing FHTC work at Laxmiganj, Gonna and Gopinathbati and Dwariapur village within Dwariapur Piped Water Supply Scheme at Ausgram-I Block within Durgapur Sub-Division under Burdwan Division, PHE Dte.[SL-B] Assistant Engineer, Durgapur Sub Division, P.H.E. Dte ORD/000621/2021-2022 163/DSD 16/03/2022 15 RANADHIR SINHA 4.12 4.12 100 1
Total 105.77 70.03 66.21