Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 1,623.12 62.87 3.87  
1 BIRBHUM Rampurhat - I Birbhum Division Dakhalbati Piped Water Supply Scheme. , SM/18363 New Sinking of 200 mm dia Alll through and 25 m deep tubewell , 5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements, 4.10 m X 3.50 m Pump house without sanitary arrangements, 8.00 m X 8.00 m Pump room/ Chlorine room with sanitary arrangements, 350 CuM, 300 CuM, 250 CuM capacity O.H.R. for Zone-I, II and III respectively, 300 CuM CWR, Boundary wall, Soil Investigation, Land development, Rising main, Laying distribution, road restoration for Zone-I, II and III and Providing functional household tap connection related to water supply scheme at DAKHALBATI & its adjoining mouzas water supply scheme within RAMPURHAT-I Block including supply of all labour & materials under BIRBHUM Division, PHE Dte". AE JE1 ORD/000110/2024-2025 2117/BHM 29/07/2024 365 M/S GOUTAM DAS 1,419.03 0.00 0 0
2 BIRBHUM Rampurhat - I Birbhum Division Dakhalbati Piped Water Supply Scheme. , SM/18363 New Material Requisition To Resource Division RTOR000024/2024-2025 2447/BHM 30/08/2024 Resource Division 40.44 0.00 0 0
3 BIRBHUM Rampurhat - I Bolpur Mechanical Dakhalbati Piped Water Supply Scheme. , SM/18363 New Supply and Installation of Low lift Pumping Machinery and other allied work for DHAKALBATI and Adjoining moujas water supply scheme within Rampurhat - I Block under Bolpur Mechanical Division PHE Dte Assistant Engineer-III Junior Engineer ORD/000870/2023-2024 3377/Bol.MD 13/10/2023 90 M. S. ENTERPRISE 65.12 39.27 60.3 30
4 BIRBHUM Rampurhat - I Bolpur Mechanical Dakhalbati Piped Water Supply Scheme. , SM/18363 New Supply & Installation of High lift Pumping Mchinery and other allied work for DHAKALBATI & Adjoining moujas water supply scheme within Rampurhat - I Block under Bolpur Mechanical Division PHE Dte. Assistant Engineer-III Junior Engineer ORD/000874/2023-2024 3367/BOL.MD 11/10/2023 90 M. S. ENTERPRISE 98.53 23.60 23.95 50
Total 1,623.12 62.87 3.87