Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 21,651.43 2.83 0.01  
1 BIRBHUM Labpur Birbhum Division MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Different works related to water supply scheme at MASTALI Piped Water Supply Scheme (TSM/017207) within Labpur Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division, PHE Dte. (3rd Call) AE JE1,JE3 ORD/000473/2023-2024 523/BHM 05/02/2024 270 PREMANANDA ROY BISWAS 302.55 0.00 0 20
2 BIRBHUM Labpur Birbhum Division MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Continuation work Order for "Preparation & Submission of Detail Project Report (DPR) for MASTALI Piped Water Supply Scheme under Labpur Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte." AE JE3 ORD/000657/2022-2023 172/BSD 29/04/2022 360 APEX ENGINEERING 3.16 1.29 40.82 100
3 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New New power connection at Mastali PWSS(P/H-I) BILL/00565/2024-2025 BP-24-25-162 27/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.35 0.00 0 null
4 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Hiring of Car (B.S.-IV) WB-53 C 3045. for the Office of the Assistant Engineer- III, Central Mechanical Division, PHE. Dte. Under Bolpur Mechanical Division, P.H.E. Dte. Assistant Engineer-III Junior Engineer ORD/000210/2024-2025 748./AE-III 29/04/2024 59 RAJIB GHOSH 0.28 0.00 0 0
5 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Hiring of Car (B.S.-IV) WB-53 C 3045. for the Office of the Assistant Engineer- III, Central Mechanical Division, PHE. Dte. Under Bolpur Mechanical Division, P.H.E. Dte. Assistant Engineer-III Junior Engineer ORD/000331/2024-2025 920/AE-III 24/06/2024 92 RAJIB GHOSH 0.44 0.00 0 0
6 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Hiring of Luxury Car (Diesel) for the office of the Assistant Engineer, Bolpur Mechanical Division. PHE. Dte. Assistant Engineer (HQ) Junior Engineer ORD/001382/2023-2024 3397/BOL.MD 31/10/2023 121 RAJIB GHOSH 0.57 1.54 270.18 100
7 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Hiring of Car (B.S.-IV) WB-53 C 3045. for the Office of the Assistant Engineer- III, Central Mechanical Division, PHE. Dte. Under Bolpur Mechanical Division, P.H.E. Dte. Assistant Engineer-III Junior Engineer ORD/001419/2023-2024 119/AE-III 22/01/2024 92 RAJIB GHOSH 0.44 0.00 0 0
8 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Hiring of Car (B.S.-IV) WB-53 C 3045. for the Office of the Assistant Engineer- III, Central Mechanical Division, PHE. Dte. Under Bolpur Mechanical Division, P.H.E. Dte. Assistant Engineer-III Junior Engineer ORD/001420/2023-2024 1132./AE-III 12/09/2023 92 RAJIB GHOSH 0.44 0.00 0 100
9 BIRBHUM Labpur Bolpur Mechanical MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Hiring of Car (B.S.-IV) WB-53 C 3045. for the Office of the Assistant Engineer- III, Central Mechanical Division, PHE. Dte. Under Bolpur Mechanical Division, P.H.E. Dte. ORD/001421/2023-2024 760/AE-III 27/06/2023 92 RAJIB GHOSH 0.44 0.00 0 100
10 BIRBHUM Labpur Central Drilling MASTALI PIPED WATER SUPPLY SCHEME , SM/16275 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 21,651.43 2.83 0.01