Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 23,696.98 4.53 0.02  
1 BIRBHUM Nanoor Birbhum Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/14895 New Construction of 250 & 150 CuM. Capacity O.H.R. with Soil Investigation, 5.90 m X 4.10 m Pump room/ Chlorine room with sanitary arrangements Laying of Rising Main, Distribution System with FHTC including different works related to SANTOSHPUR / NAWADA PALANDI /PAPURI / SAJNOR / RAYEN PIPED WATER SUPPLY SCHEME (5 Nos Scheme) within NANOOR Block including supply of all labour & materials under Bolpur Sub-Division within Birbhum Division PHE DTE. AE JE2,Bolpur Sub-Division,JE3 ORD/000085/2024-2025 1951/BHM 04/07/2024 365 UMWELT ENGINEER PVT. LTD. 2,322.64 0.00 0 0
2 BIRBHUM Nanoor Birbhum Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/14895 New Continuation work order for "Preparation & Submission of Detail Project Report (DPR) for SANTOSHPUR Piped Water Supply Scheme under Nanoor Development Block within Bolpur Sub-Division under Birbhum Division, PHE Dte.". AE JE4 ORD/000649/2022-2023 209/BSD 25/05/2022 90 RADIANT 4.73 4.53 95.77 100
3 BIRBHUM Nanoor Birbhum Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/14895 New Material Requisition To Resource Division RTOR000003/2024-2025 2383/BHM 27/08/2024 Resource Division 10.16 0.00 0 0
4 BIRBHUM Nanoor Birbhum Division SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/14895 New Material Requisition To Resource Division RTOR000073/2023-2024 1464/BHM 25/04/2023 Resource Division 19.69 0.00 0 0
5 BIRBHUM Nanoor Central Drilling SANTOSHPUR PIPED WATER SUPPLY SCHEME , SM/14895 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
Total 23,696.98 4.53 0.02