Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 1,519.14 817.74 53.83  
1 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Construction of 700cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC Raft foundation including pipe connection & allied works for augmentation of Khyarasole Zone I W/S Scheme under Birbhum Sadar Sub Division within Birbhum Division, PHE Dte.(As per Departmental Drawing) AE JE1 ORD/000012/2023-2024 1255/BHM 17/04/2023 270 M/S KRIPASINDHU GHOSH & CO. 151.36 45.41 30 70
2 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Construction of 200cum capacity 20mtr. Staging height RCC Over Head Reservoir over RCC Raft foundation including pipe connection & allied works for augmentation of Khyarasole Zone II W/S Scheme under Birbhum Sadar Sub Division within Birbhum Division, PHE Dte.(As per Departmental Drawing) AE ORD/000092/2023-2024 1646/BHM 02/05/2023 270 U TURN CONSTRUCTION 71.24 45.42 63.76 89
3 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Laying distribution system including FHTC for proposed augmentation scheme for Khayrasole Zone-II Piped Water Supply Scheme, Khayrasole Block, under Birbhum Division, PHE Dte? (Sl. No.5) AE JE2 ORD/000257/2022-2023 1149/BHM 23/05/2022 180 TIRUPATI ENTERPRISES 229.96 223.47 97.18 85
4 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Balance work for Laying distribution system including FHTC for proposed augmentation scheme for Khayrasole Zone-I Piped Water Supply Scheme, Khayrasole Block, under Birbhum Division, P.H.E. Dte AE JE ORD/000257/2023-2024 3440/BHM 03/08/2023 90 ARABINDA GUPTA 298.61 114.07 38.2 52
5 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Laying distribution system including FHTC for proposed augmentation scheme for Khayrasole Zone-I Piped Water Supply Scheme, Khayrasole Block, under Birbhum Division, PHE Dte.¿ (Sl. No.4) AE JE1 ORD/000274/2022-2023 1157/BHM 23/05/2022 180 M/S S.S. ENTERPRISE 372.63 372.32 99.92 80
6 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Trial Bore and Sinking of 200 mm dia. 2(Two) nos.tubewell 30m. (avg.) depth fitted with PVC pipes & fittings Schedule 80 (medium duty) and Fibre Glass Strainer on the river bank of Ajoy under Khayrasole Piped Water Supply Scheme under Birbhum Sadar Sub-Division, P.H.E. Dte. within Birbhum Division, PHE Dte. (Sl. No. -01) AE JE1 ORD/000408/2022-2023 73/BSSD 02/05/2022 15 SK FAQHRUL AMIN 3.80 2.89 76.05 100
7 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Replacement of rising main pipe line from AC Pipe line to DI K9 and concreting work in the premesis of CWR site and other allied works under Augmentation of Khayrasole Piped Water Supply Scheme (Zone-I) under Birbhum Sadar Sub-Division, P.H.E. Dte. within Birbhum Division PHE Dte.(Sl. No. -16) AE JE1 ORD/000595/2022-2023 227/BSSD 21/09/2022 20 HIRANMAY GHOSH 4.88 4.73 96.93 0
8 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Construction of PCC Pillar for laying of 250 mm dia. rising main pipe line over Hinglow River near Pansuili for Khayrasole Piped Water Supply Scheme under Birbhum Sadar Sub-Division, P.H.E. Dte. within Birbhum Division, P.H.E. Dte. AE JE1 ORD/000598/2022-2023 1043/BHM 31/03/2023 30 HIRANMAY GHOSH 4.55 4.46 98.02 100
9 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Laying of Distribution Pipe line from Dihipara Hanuman Mandir to Kendragaria Railway crossing under Khoyrasole Piped Water Supply Scheme under Birbhum Sadar Sub-Division within Birbhum Division P.H.E. Dte. (Sl. No. - 04) AE JE2 ORD/001086/2021-2022 398/BSSD 10/12/2021 15 B.M.SARKAR 4.99 4.97 99.6 100
10 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Material Requisition To Resource Division RTOR000004/2023-2024 1118/BHM 10/04/2023 Resource Division 13.35 0.00 0 0
11 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Material Requisition To Resource Division RTOR000021/2022-2023 900/BHM 26/04/2022 Resource Division 9.93 0.00 0 0
12 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Material Requisition To Resource Division RTOR000033/2022-2023 2292/BHM 20/10/2022 Resource Division 64.91 0.00 0 0
13 BIRBHUM Birbhum Division Augmentation of Khoyrasole Piped Water Supply Scheme , SM/10343 Augmentation Material Requisition To Resource Division RTOR000034/2022-2023 2556/BHM 21/11/2022 Resource Division 288.93 0.00 0 0
Total 1,519.13 817.72 53.83