Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 241.86 122.05 50.46  
1 BIRBHUM Birbhum Division Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Construction of 150 Cum Capacity and 20.0m Staging Height RCC Over Head Reservoir along with Soil Test and Laying pipeline for Augmentation of Nagari w/s Scheme under Birbhum Sadar Sub-Division within Birbhum Division,P.H.E. Dte. (Sl. No.6) AE JE3 ORD/000432/2022-2023 105/BHM 11/01/2023 180 M/S KRIPASINDHU GHOSH & CO. 189.64 106.55 56.19 75
2 BIRBHUM Birbhum Division Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Trial Bore and Sinking for 03 nos. working 200mm dia. Tubewell of 6m depth each with horizontal strainer on the river Bed of Kuskurini and connecting pipe line etc. complete under Augmentation of Nagari Piped Water Supply Scheme under Birbhum Sadar Sub-Division, P.H.E Dte. within Birbhum Division P.H.E. Dte. AE JE3 ORD/000509/2023-2024 652/BHM 20/02/2024 45 INDRANIL DUTTA 7.99 0.00 0 100
3 BIRBHUM Birbhum Division Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Material Requisition To Resource Division RTOR000003/2023-2024 1114/BHM 10/04/2023 Resource Division 2.73 0.00 0 0
4 BIRBHUM Birbhum Division Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Material Requisition To Resource Division RTOR000100/2022-2023 970/BHM 27/03/2023 Resource Division 11.88 0.00 0 0
5 BIRBHUM Birbhum Division Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Material Requisition To Resource Division RTOR000194/2023-2024 3275/BHM 27/07/2023 Resource Division 0.34 0.00 0 0
6 BIRBHUM Bolpur Mechanical Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Supply & delivery of Electrical accessories for Augmentation of Nagari water supply scheme (Block- Suri - I) under Bolpur Mechanical Division, PHE Dte. ORD/000453/2024-2025 1301./AE-III 27/08/2024 7 HINDOL ROY 2.80 0.00 0 0
7 BIRBHUM Bolpur Mechanical Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Providing and Installation of Submersible pumping Machineries at newly sunk Tube Wells and allied works at Augmentation of Nagari Piped Water Supply Scheme, Block-Suri-I under Bolpur Mechanical Division, PHE Dte. Assistant Engineer-III Junior Engineer ORD/000470/2023-2024 2223/Bol.MD 12/09/2023 60 HINDOL ROY 23.52 14.02 59.61 50
8 BIRBHUM Bolpur Mechanical Augmentation of Nagari Piped Water Supply Scheme , SM/10312 Augmentation Supply & delivery of 80mm dia Column Pipe for Augmentation of Nagari water supply scheme (Block- Suri - I) under Bolpur Mechanical Division, PHE Dte. " Assistant Engineer-III Junior Engineer ORD/000499/2024-2025 1450./AE-III 09/09/2024 7 VIBGYOR INFOTECH 2.96 1.48 50 0
Total 241.85 122.06 50.47