Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
4 64.25 42.31 65.85  
1 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area INDUS WATER SUPPLY SCHEME of Labpur Block under Birbhum Division, PHE Dte. , SM/08895 Retrofitting Trial Run of pipeline (CI/ DI/ UPVC) (Distribution Main & Rising Main ), Sluice Valve/ Air Valve/ Non Return Valve, S.S.P. etc. of INDAS Water Supply Scheme , under Bolpur Sub-Division within Birbhum Division, P.H.E. Dte. (from 01.05.2022 to 31.07.2022). (Sl. No.: 03). AE JE1 ORD/000056/2022-2023 173/BSD 29/04/2022 92 QUAZI SIRAJUL ISLAM. 1.13 0.00 0 0
2 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area INDUS WATER SUPPLY SCHEME of Labpur Block under Birbhum Division, PHE Dte. , SM/08895 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of "INDUS W/S Scheme in Bolpur Sub-Division under Birbhum Division, PHE Dte. " (Sl. No. 05) AE JE1 ORD/000414/2021-2022 2065/BHM 13/12/2021 60 QUAZI SIRAJUL ISLAM. 61.02 42.31 69.34 100
3 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area INDUS WATER SUPPLY SCHEME of Labpur Block under Birbhum Division, PHE Dte. , SM/08895 Retrofitting Rising Main Pipe line from TW1, TW2 to OHR including of CI specials for proposed INDUS piped Water Supply Scheme, under Bolpur Sub-Division within Birbhum Division, PHE Dte. (Sl. No.: 1) AE JE1 ORD/000596/2020-2021 21/BSD 29/01/2021 30 SYED HASMAT ALI 1.45 0.00 0 100
4 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) within the command area INDUS WATER SUPPLY SCHEME of Labpur Block under Birbhum Division, PHE Dte. , SM/08895 Retrofitting Supply and delivery of 80mm dia. Sluice Valves, including loading, carriage and unloading at Bolpur Sub-Divisional Store at PHE Complex, Surul, Bolpur, Dist. - Birbhum for Indas Water Supply Scheme under Bolpur Sub-Division within Birbhum Division, PHED. (Sl. No.: 03). AE JE1 ORD/000657/2021-2022 27/BSD 21/01/2022 15 MAKALI ENGINEERING CORPORATION 0.65 0.00 0 100
Total 64.26 42.31 65.85