Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 174.1 75.47 43.35  
1 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Baliharpur Water Supply Scheme within Birbhum Sadar Sub-Division under Birbhum Division, PHE Dte.¿ (Sl. No.5) AE JE3 ORD/000020/2022-2023 820/BHM 13/04/2022 60 S S ENTERPRISE 93.73 45.35 48.38 100
2 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Balance work for Providing Functional Household tap connections (FHTC) from existing distribution system within the command area of Baliharpur piped water supply scheme (Palan and rest of Baliharpur , Muralpur, Kusumkandar, Salchatra , Kendsarail, Dhatrabandhi,Hosaipur & bhagabandha ) under Birbhum Sadar sub division P.H.E Dte. AE ORD/000096/2023-2024 1645/BHM 02/05/2023 45 BIJOY KUMAR CHOUDHURY 57.82 30.12 52.09 55
3 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Dressing and levelling of over undulated existing land of CWR & pump house site by earth cutting at plot no.295 mouza-Hinglo, JL No.40 for Baliharpur Piped Water Supply Scheme of Block-Md. Bazar under Birbhum Division, PHE Dte, (Sl. No.7) AE(HQ) ORD/000111/2022-2023 762/BHM 06/04/2022 10 GOUTAM DAS 0.96 0.00 0 100
4 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Allied work for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Baliharpur Piped Water Supply Scheme within Birbhum Sadar Sub-Division under Birbhum Division, P.H.E Dte. AE Estimator ORD/000604/2022-2023 1048/BHM 31/03/2023 45 M/S GOUTAM DAS 15.07 0.00 0 100
5 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Work Order for Sinking of 2 (Two) nos. 200 mm dia. Tubewell of 6m depth with horizontal strainer on the river Bed of Dwarka River and Connecting Pipe line from Tubewells to C.W.R under Baliharpur Piped Water Supply Scheme in Mahammad Bazar Block, Dist: Birbhum under Birbhum Division, P.H.E. Dte. (Sl. No.-01) AE(HQ) ORD/000809/2021-2022 418/BHM 24/02/2022 30 BHABATARAN SADHU 4.29 0.00 0 100
6 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Laying remaining portion DI(K9) clear water rising main Pipe Line from CWR towards OHR under Baliharpur Piped Water Supply Scheme in Mahammad Bazar Block, Dist: Birbhum under Birbhum Division P.H.E. Dte. (Sl. No.-02) AE(HQ) ORD/000811/2021-2022 417/BHM 24/02/2022 30 LAXMI NARAYAN ENGINEERS CO-OP SOCIETY LTD 1.78 0.00 0 100
7 BIRBHUM Birbhum Division Retrofitting works for providing Functional Household Tap Connection (FHTC) under Baliharpur(Phase-I) PWSS , SM/07648 Retrofitting Trial Bore for Sinking of 200mm dia. Tubewell on the river Bank & Bed of Dwaraka under Baliharpur Piped Water Supply Scheme under Birbhum Division P.H.E. Dte. (Sl. No.-01) AE(HQ) ORD/000836/2021-2022 2025 /BHM 04/01/2022 30 BHABATARAN SADHU 0.45 0.00 0 100
Total 174.11 75.48 43.35