Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 119.56 76.2 63.73  
1 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting Payment for Supply of diesel BILL/00270/2023-2024 BP-2023-24-127 25/08/2023 JAYRAM FILLING STATION 0.72 0.00 0 0
2 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area in the villages Narayanpur of Narayanpur w/s Scheme at Rampurhat-I Block under Birbhum Division, PHE Dte. (Sl. No.12) AE JE1 ORD/000042/2020-2021 1426 / BHM 04/11/2020 60 SUNIL RABI DAS 35.91 35.58 99.08 0
3 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area in the villages Balia Mrityunjoypur of Narayanpur w/s Scheme under Rampurhat Sub Division within Birbhum Division, PHE Dte. (Sl. No.3) AE JE1 ORD/000226/2020-2021 1706/BHM 23/12/2020 60 SANJUKTA ENGINEERS 36.44 6.91 18.96 27
4 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting Sinking of o1 (one) No 200mm dia.X 42.0 mtr deep Tube Well with UPVC pipe & strainer for Narayanpur W/s scheme under Birbhum Division, P.H.E. Dte. AE JE1 ORD/000543/2021-2022 30/RSD 04/01/2022 30 ISLAM CONSTRUCTION 2.92 0.00 0 50
5 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting PCC Work for road restoration at Hattala due to laying of 160mm dia HDPE Bypass Pipe line from CWR to Suripara more for providing drinking water at Hattala surrounding Area of Narayanpur W/S Scheme under Rampurhat Sub- Division, P.H.E. Dte within Birbhum Division P.H.E. Dte AE JE3 ORD/000585/2022-2023 1012/BHM 30/03/2023 45 ISLAM CONSTRUCTION 4.17 4.15 99.52 0
6 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting Laying Bypass UPVC Pipe line from CWR to Suripara more for providing drinking water Hattala surrounding Area of Narayanpur W/S Scheme under Rampurhat Sub-Division, P.H.E. Dte within Birbhum Division, P.H.E. Dte. (Sl. No.2) AE JE1 ORD/000815/2021-2022 2069/BHM 13/12/2021 60 ISLAM CONSTRUCTION 13.26 12.86 96.98 50
7 BIRBHUM Birbhum Division Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting Laying of Distribution System by HDPE pipe below heavy duty PWD concrete Road at Narayanpur for Narayanpur Water Supply Scheme Form Bhawani Padmabati Pry School to Narayanpur High School under Rampurhat Sub-Division, within Birbhum Division P.H.E Dte. (Sl. No.4) AE JE1 ORD/000842/2021-2022 622/BHM 11/03/2022 60 SANJUKTA ENGINEERS 6.96 0.00 0 0
8 BIRBHUM Central Drilling Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 200MM X 150 MTRS DEPTH) BY UTILIZING DEPARTMENTAL MACHINERIES FOR NARAYANPUR W/S SCH, SAINTHIA BLOCK UNDER BIRBHUM DISTRICT, CDD, PHE DTE. ORD/000278/2022-2023 1133/CDD 04/11/2022 30 MENAKA ENTERPRISE 8.09 8.09 100 100
9 BIRBHUM Central Drilling Retrofitting works of Narayanpur(Phase-II) Water Supply Scheme under Rampurhat-I Block for providing Functional Household Tap Connection(FHTC) within the command area of the scheme , SM/07153 Retrofitting PROVIDING DRILLING CREW AND OTHER ALLIED WORKS FOR CONSTRUCTION OF TUBE WELL (250MM X 200MM X 150 MTRS DEPTH) BY UTILISING DEPARTMENTAL MACHINERIES FOR NARAYANPUR W/S SCHEME, SAINTHIA BLOCK UNDER BIRBHUM DISTRICT, CDD, PHE DTE. Driller In Charge Junior Engineer ORD/000279/2022-2023 1132/CDD 04/11/2022 30 MENAKA ENTERPRISE 11.09 8.61 77.64 92
Total 119.57 76.20 63.73