Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 22,253.48 102.64 0.46  
1 MURSHIDABAD Central Drilling AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Planning,Design,Investigation,Construction,Erection,Installation,Completion testing and Commissioning in all respect of entire units of Arsenic cum Iron Removal Plant (AIRP) of different capacities capable of removing arsenic & Iron Present in Ground Water in different concentration to acceptable limit as per latest BIS Code on basis of departmental process drawing (MODIFIED SUJAPUR SADIPUR) along with 5 (Five) years Operation & Maintenance after successful completion of 3 (three) months Trial Run of "Augmentation of KASHIPUR ZONE-I" ground water supply scheme in BELDANGA-II Block, under Berhampore Division-I, P.H.E Dte(Capacity-30.00 Cum/hr.) Type-4: Partial Gravity System with Pressure Filter and Pressurized Upflow Polishing Assistant Engineer-II ORD/000032/2024-2025 995/BD-I 20/06/2024 365 EFFLUENT & WATER TREATMENT ENGINEERS (P) LTD 143.92 0.00 0 0
3 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation KASHIPUR ZONE-I PROPOSED PWSS to accommodate construction of Boundary Wall under Jal Jivan Mission of BELDANGA-II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-II ORD/000061/2024-2025 1176/BD-I 25/07/2024 60 HI-TECH ENGINEERS CO-OPERATIVE & CONSTRUCTION SOCIETY LTD. 20.39 0.00 0 0
4 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Replacement of Filter media of Existing AIRP of (Capacity 126 Cum/hr.) with allied work at Kashipur Zone-I Water Supply Scheme under Jal Jeevan Mission under Berhampore Division-I, PHEengineering Dte. Assistant Engineer-II ORD/000068/2024-2025 1206/BD-I 26/07/2024 30 M/S SAJAHAN CHOWDHURY 35.07 0.00 0 0
5 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Augmentation of Kashipur Zone-I Piped water supply scheme to accommodate construction of laying of design pipeline and providing FHTC (Functional Household Tap Connection) under Jal Jeevan Mission in Beldanga-II Block of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer-II JE,Junior Engineer-I ORD/000161/2023-2024 668/BD-I 09/08/2023 180 MAMON ENTERPRISE AND CONSTRUCTION 236.94 50.12 21.15 35
6 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Augmentation of Kashipur Zone-I Piped water supply scheme to accommodate construction of OHR, laying of design pipeline and providing FHTC (Functional Household Tap Connection) under Jal Jeevan Mission in Beldanga-II Block of Murshidabad District under Berhampore Division-I, PHE Dte. Assistant Engineer-II JE,Junior Engineer-I ORD/000162/2023-2024 667/BD-I 09/08/2023 365 SAMIMA ENTERPRISE 358.74 49.65 13.84 22
7 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Route Survey ,Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Jal Swapna for KASHIPUR ZONE-I Water Supply Scheme of BELDANGA-II Block of Murshidabad District under Berhampore Division-I ,P.H.E Dte. Assistant Engineer-II JE_Pravin Kumar Gupta ORD/000189/2023-2024 531/BD-I 27/07/2023 10 TECHVISION 2.87 2.87 100 100
8 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Repair And Renovation Works Of OHR (550 Cum) forKasipur Zone-I water supply scheme of Beldanga-II block under Berhampore Division-I PHE Dte. in the district Murshidabad. Augmentation of PWSS under Jal jeevan Mission. Assistant Engineer-II Junior Engineer-I ORD/000300/2023-2024 1068/BD-I 21/11/2023 30 CHAND ENTERPRISE 9.22 0.00 0 100
9 MURSHIDABAD Berhampore Division I AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation Material Requisition To Resource Division RTOR000106/2023-2024 201/BD-1/7 10/02/2024 Resource Division 101.30 0.00 0 0
10 MURSHIDABAD Berhampore Mechanical AUGMENTATION OF KASHIPUR (ZONE I) PIPED WATER SUPPLY SCHEME. , SM/18602 Augmentation NEW CONNECTION AT KASHIPUR Z-I PH-I BILL/01578/2023-2024 409/WBSEDCL-JJM 06/03/2024 WBSEDCL 5.27 0.00 0 0
Total 22,253.50 102.65 0.46