Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 871.72 35.49 4.07  
1 MURSHIDABAD Bhagawangola - II Central Drilling MALIPUR PIPED WATER SUPPLY SCHEME. , SM/16785 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) ORD/000215/2023-2024 2235/CDD 11/03/2024 150 JHARGRAM SPV PRIVATE LIMITED 720.23 0.00 0 10
2 MURSHIDABAD Bhagawangola - II Berhampore Division I MALIPUR PIPED WATER SUPPLY SCHEME. , SM/16785 New MALIPUR PWSS to accommodate construction of Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jivan Mission of Bhagwangola-II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer-I JE_RAJIB BISWAS ORD/000099/2023-2024 209/BD-I 17/05/2023 90 PRANAB KUMAR GHOSH 39.48 7.31 18.52 45
3 MURSHIDABAD Bhagawangola - II Berhampore Division I MALIPUR PIPED WATER SUPPLY SCHEME. , SM/16785 New MALIPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising main , under Jal Jivan Mission of BHAGWANGOLA - II Block, Murshidabad District under Berhampore Division-I, PHE.Dte. . Assistant Engineer-I JE_RAJIB BISWAS ORD/000131/2023-2024 610/BD-I 02/08/2023 180 ROY CONSTRUCTION (AVIJIT ROY) 85.64 25.67 29.97 5
4 MURSHIDABAD Bhagawangola - II Berhampore Division I MALIPUR PIPED WATER SUPPLY SCHEME. , SM/16785 New Preparation of DPR for drinking water supply scheme to facilitate 1 No Uncovered mouzas of Malipur under Amradaha G.P of Bhagwangola - II Block which includes Route survey using DGPS/Drone/Total Station etc. & all related field work for technical data collection, Household Survey using PHED developed mobile application, Preparation and supply of Geo reference drawing / layout plan of the zone-wise Command area of water distribution and transmission Pipeline network of the schemes showing all requisite features, design of Pipeline Network. Design (if necessary), drawing & estimation of all necessary structures, Preparation & Submission of DPR booklets & Bid Document ( in both hard and soft copies) including Preparation of Booklet for SLSSC for individual PWSS, all complete in consultation with the EIC under Berhampore Division-I P.H.E. Dte. Assistant Engineer-I JE_Pravin Kumar Gupta ORD/000299/2022-2023 1693/BD-I 14/03/2023 15 RADIANT 2.51 2.51 100 100
5 MURSHIDABAD Bhagawangola - II Berhampore Division I MALIPUR PIPED WATER SUPPLY SCHEME. , SM/16785 New Material Requisition To Resource Division RTOR000044/2023-2024 61/BD-1/30 27/04/2023 Resource Division 18.60 0.00 0 0
6 MURSHIDABAD Bhagawangola - II Berhampore Mechanical MALIPUR PIPED WATER SUPPLY SCHEME. , SM/16785 New NEW CONNECTION MALIPUR PH-1 BILL/01490/2023-2024 372/WBSEDCL-JJM 21/02/2024 WBSEDCL 5.26 0.00 0 0
Total 871.72 35.49 4.07