Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 587.12 0 0  
1 MURSHIDABAD Lalgola Central Drilling GAYSEPUR PIPED WATER SUPPLY SCHEME , SM/16018 New Construction of Big diameter Tube-Well by Deployment of Suitable capacity Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different District for Different Water Supply Schemes Including Procurement & Installation Pumping machinery with All Allied accessories at the Above Constructed Tube - Wells under JJM Program throughout the State of West Bengal. (2nd call of NIET 25 of 2022-23). Assistant Engineer,Driller In Charge Junior Engineer ORD/000022/2024-2025 492/CDD 23/07/2024 90 JHARGRAM SPV PRIVATE LIMITED 458.70 0.00 0 0
2 MURSHIDABAD Lalgola Berhampore Division I GAYSEPUR PIPED WATER SUPPLY SCHEME , SM/16018 New GAYESPUR PWSS to accommodate FHTC, Laying Distribution System, Laying Rising main under Jal Jeevan Mission of LALGOLA Block, Murshidabad District under Berhampore Division-I, PHE.Dte. Assistant Engineer,Assistant Engineer-I JE ORD/000048/2023-2024 144/BD-I 15/05/2023 180 SAPTADIP CONSTRUCTION 58.85 0.00 0 0
3 MURSHIDABAD Lalgola Berhampore Division I GAYSEPUR PIPED WATER SUPPLY SCHEME , SM/16018 New GAYESPUR PWSS to accommodate construction of Pump House Cum Chlorine Room, boundary wall and service road, under Jal Jeevan Mission of Lalgola Block, Murshidabad District under Berhampore Division-I, PHE.Dte. ORD/000343/2023-2024 1257/BD-I 22/12/2023 90 M/S HUMAYUN BISWAS 39.06 0.00 0 0
4 MURSHIDABAD Lalgola Berhampore Division I GAYSEPUR PIPED WATER SUPPLY SCHEME , SM/16018 New Material Requisition To Resource Division RTOR000032/2023-2024 61/BD-1/15 27/04/2023 Resource Division 6.62 0.00 0 0
5 MURSHIDABAD Lalgola Berhampore Division I GAYSEPUR PIPED WATER SUPPLY SCHEME , SM/16018 New Material Requisition To Resource Division RTOR000115/2023-2024 304/BD-1/7 22/02/2024 Resource Division 3.02 0.00 0 0
6 MURSHIDABAD Lalgola Berhampore Mechanical GAYSEPUR PIPED WATER SUPPLY SCHEME , SM/16018 New Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well in connection to Accommodate FHTC at Pump House No.-I & II under Gaysepur ground water based water supply scheme under Block_ Lalgola Dist. - Murshidabad under MEDB, PHE Dte. ASSISTANT ENGINEER-I,ASSISTANT ENGINEER-II Junior engineer-I,Junior engineer-II,Junior engineer-III ORD/000651/2023-2024 3661/MEDB 03/11/2023 90 DAS ENTERPRISE ( MANGO LANE) 20.87 0.00 0 0
Total 587.12 0.00 0